USGS Logo SCEC Logo 

Time series metrics for tpv27v2

User #1: wollher (Stephanie Wollherr - DG Finite Element - SeisSol- 100m)

User #2: barall (Michael Barall - FaultMod - 100 m)

On-Fault Stations

 

  2d-stress 2d-rate 2d-slip n-stress t-shift
faultst-050dp000 4.4     34.4 -0.004
faultst-050dp050 2.0 2.1 0.5 16.6 -0.018
faultst-050dp100 4.8 2.9 0.6 15.1 -0.012
faultst-050dp150 4.8 8.1 1.7 197.4 -0.072
faultst-150dp100 1.8 3.9 1.2 126.8 -0.038
faultst000dp100 2.0 3.0 0.9 152.5 -0.021
faultst050dp100 1.9 3.8 0.9 102.3 -0.038
faultst100dp100 2.2 4.7 0.9 62.8 -0.050
faultst150dp000 15.1     37.9 -0.054
faultst150dp050 2.5 2.8 1.3 67.9 -0.068
faultst150dp100 2.6 5.1 1.0 88.9 -0.062
faultst150dp150 4.1 12.2 2.6 18.7 -0.098

 

Normalized RMS difference (percent)
0.2  
 
 
 
 
 
89.5

 

Time shift (s)
0.002  
 
 
 
 
 
0.154

 

On-Fault Stations
faultst-050dp000 strike -5.0 km, dip 0.0 km
faultst-050dp050 strike -5.0 km, dip 5.0 km
faultst-050dp100 strike -5.0 km, dip 10.0 km
faultst-050dp150 strike -5.0 km, dip 15.0 km
faultst-150dp100 strike -15.0 km, dip 10.0 km
faultst000dp100 strike 0.0 km, dip 10.0 km
faultst050dp100 strike 5.0 km, dip 10.0 km
faultst100dp100 strike 10.0 km, dip 10.0 km
faultst150dp000 strike 15.0 km, dip 0.0 km
faultst150dp050 strike 15.0 km, dip 5.0 km
faultst150dp100 strike 15.0 km, dip 10.0 km
faultst150dp150 strike 15.0 km, dip 15.0 km

 

Fields
2d-stress Shear stress vector
2d-rate Slip rate vector
2d-slip Slip vector
n-stress Normal stress
t-shift Time shift