USGS Logo SCEC Logo 

Time series metrics for tpv27v2

User #1: barall.3 (Michael Barall - FaultMod - 100 m - Larger Mesh)

User #2: duan.3 (Benchun Duan - Finite Element - EQdyna - 100m coarser)

On-Fault Stations

 

  2d-stress 2d-rate 2d-slip n-stress t-shift
faultst-050dp000 19.6     83.0  0.178
faultst-050dp050 2.6 4.0 1.1 36.0  0.032
faultst-050dp100 4.6 5.3 0.7 39.6  0.002
faultst-050dp150 3.8 7.2 1.1 113.3  0.067
faultst-150dp100 1.9 4.1 0.7 38.4  0.104
faultst000dp100 2.7 3.4 0.7 35.7  0.045
faultst050dp100 2.2 3.9 0.9 38.6  0.104
faultst100dp100 2.1 4.2 0.8 31.0  0.140
faultst150dp000 35.9     89.7  0.154
faultst150dp050 3.3 3.4 0.9 11.2  0.154
faultst150dp100 2.3 4.5 0.8 27.9  0.174
faultst150dp150 3.8 8.7 2.2 50.0  0.242

 

Normalized RMS difference (percent)
0.2  
 
 
 
 
 
89.5

 

Time shift (s)
0.002  
 
 
 
 
 
0.154

 

On-Fault Stations
faultst-050dp000 strike -5.0 km, dip 0.0 km
faultst-050dp050 strike -5.0 km, dip 5.0 km
faultst-050dp100 strike -5.0 km, dip 10.0 km
faultst-050dp150 strike -5.0 km, dip 15.0 km
faultst-150dp100 strike -15.0 km, dip 10.0 km
faultst000dp100 strike 0.0 km, dip 10.0 km
faultst050dp100 strike 5.0 km, dip 10.0 km
faultst100dp100 strike 10.0 km, dip 10.0 km
faultst150dp000 strike 15.0 km, dip 0.0 km
faultst150dp050 strike 15.0 km, dip 5.0 km
faultst150dp100 strike 15.0 km, dip 10.0 km
faultst150dp150 strike 15.0 km, dip 15.0 km

 

Fields
2d-stress Shear stress vector
2d-rate Slip rate vector
2d-slip Slip vector
n-stress Normal stress
t-shift Time shift