Staff Priorities - Fabio: Difference between revisions

From SCECpedia
Jump to navigationJump to search
Fsilva (talk | contribs)
No edit summary
Fsilva (talk | contribs)
No edit summary
 
(5 intermediate revisions by the same user not shown)
Line 1: Line 1:
== Yesterday ==
== Yesterday ==


* Back from PyCon
* Looked for obs data for NR event
* Receipts
** Forward station list table to CG
* Check mesh extraction job on Blue Waters
* Mtg with CG regarding BBP issues
* Meeting with JY regarding counting downloads on hypocenter
* Site response changes
** Surveyed current site response methods on BBP
** Make available to all methods


== Today ==
== Today ==


* Review AP revised Irikura code
* Finish site response changes
* Integrate Irikura rupture generator on BBP
** Maintain existing workflow
* Run tests to make sure we can reproduce AP's results
** Need to run differently for GP/IRIKURA/SONG versus SDSU/UCSB/EXSIM
* Run few SO CAL events on BBP server to validate code
* Update wiki page for multi-segment ruptures
** Add diagram
* Review High-F package from SA


== Blocked: ==
== Blocked: ==
Line 19: Line 23:
== Followups: ==
== Followups: ==


* Allocation call @11am
* No


== To Do: ==
== To Do: ==
Line 28: Line 32:


* BBP Code updates needed before git migration
* BBP Code updates needed before git migration
** Remove GMT dependencies and files
** Move to argparse
** Move to argparse
** Simplify tests to use smaller files
** Simplify tests to use smaller files
Line 38: Line 41:
** Run tests: 2 days
** Run tests: 2 days
** Review results: 2 days
** Review results: 2 days
==== High-F ====
* Set up High-F code repository - Total: 3 days
** Collect codes from groups, scripts - 1 day
** Select SVN/Github repository - 1 day
** Create repository - 1 day


=== Medium Term ===
=== Medium Term ===

Latest revision as of 17:48, 26 September 2016

Yesterday

  • Looked for obs data for NR event
    • Forward station list table to CG
  • Mtg with CG regarding BBP issues
  • Site response changes
    • Surveyed current site response methods on BBP
    • Make available to all methods

Today

  • Finish site response changes
    • Maintain existing workflow
    • Need to run differently for GP/IRIKURA/SONG versus SDSU/UCSB/EXSIM
  • Update wiki page for multi-segment ruptures
    • Add diagram
  • Review High-F package from SA

Blocked:

  • No

Followups:

  • No

To Do:

Short Term

Broadband Platform

  • BBP Code updates needed before git migration
    • Move to argparse
    • Simplify tests to use smaller files
    • Remove unused data files in tests directory
  • NGA-West 2 validation on BBP - Total: 6 days
    • Contact CG, collect input scenarios: 1 day
    • Write test code: 1 day
    • Run tests: 2 days
    • Review results: 2 days

Medium Term

  • Package GF generation code from RG into BBP Platform
  • New raytracing code for SDSU method
  • Update Anderson method
  • BBP Projects
  • Try logging into Gordon