Staff Priorities - Fabio: Difference between revisions

From SCECpedia
Jump to navigationJump to search
Fsilva (talk | contribs)
Fsilva (talk | contribs)
No edit summary
 
(362 intermediate revisions by the same user not shown)
Line 1: Line 1:
== Yesterday: ==
== Yesterday ==


* Fling Study
* Looked for obs data for NR event
** Finished running Scenario 104
** Forward station list table to CG
** Ran Scenario 107, compared results against John's run --> OK
* Mtg with CG regarding BBP issues
** Started Scenario 113
* Site response changes
** Updated wiki tables
** Surveyed current site response methods on BBP
* Investigated SDSU's validation run
** Make available to all methods
** BBToolbox and Amp.exe use 2 different set of velocities
** Not able to reproduce Rumi's graph, need to follow up with her


== Today: ==
== Today ==


* Fling Study
* Finish site response changes
** Continue to schedule Fling scenarios
** Maintain existing workflow
** Scenario 113 should finish soon, start 114 and 115.
** Need to run differently for GP/IRIKURA/SONG versus SDSU/UCSB/EXSIM
** Verify John's scenario 108
* Update wiki page for multi-segment ruptures
* Follow-up with Rumi wrt her validation run results
** Add diagram
* Find a place in the BB src tree to put the plot files
* Review High-F package from SA


== Blocked: ==
== Blocked: ==
* No
* No


== Followups: ==
== Followups: ==
* SDSU's result validation with Rumi


== Ongoing: ==  
* No
* Make trunk work both with and without site response
 
* Look for ways to break up the GF directory layout, some ideas are:
== To Do: ==
** First candidate is removing the plot directory from the GF directory
 
** Create separate validation package
=== Short Term ===
** Separate events and codebases from each other
 
==== Broadband Platform ====
 
* BBP Code updates needed before git migration
** Move to argparse
** Simplify tests to use smaller files
** Remove unused data files in tests directory
 
* NGA-West 2 validation on BBP - Total: 6 days
** Contact CG, collect input scenarios: 1 day
** Write test code: 1 day
** Run tests: 2 days
** Review results: 2 days
 
=== Medium Term ===
 
* Package GF generation code from RG into BBP Platform
* New raytracing code for SDSU method
* Update Anderson method
* BBP Projects
* Try logging into Gordon

Latest revision as of 17:48, 26 September 2016

Yesterday

  • Looked for obs data for NR event
    • Forward station list table to CG
  • Mtg with CG regarding BBP issues
  • Site response changes
    • Surveyed current site response methods on BBP
    • Make available to all methods

Today

  • Finish site response changes
    • Maintain existing workflow
    • Need to run differently for GP/IRIKURA/SONG versus SDSU/UCSB/EXSIM
  • Update wiki page for multi-segment ruptures
    • Add diagram
  • Review High-F package from SA

Blocked:

  • No

Followups:

  • No

To Do:

Short Term

Broadband Platform

  • BBP Code updates needed before git migration
    • Move to argparse
    • Simplify tests to use smaller files
    • Remove unused data files in tests directory
  • NGA-West 2 validation on BBP - Total: 6 days
    • Contact CG, collect input scenarios: 1 day
    • Write test code: 1 day
    • Run tests: 2 days
    • Review results: 2 days

Medium Term

  • Package GF generation code from RG into BBP Platform
  • New raytracing code for SDSU method
  • Update Anderson method
  • BBP Projects
  • Try logging into Gordon