Staff Priorities - Fabio: Difference between revisions

From SCECpedia
Jump to navigationJump to search
Fsilva (talk | contribs)
No edit summary
Fsilva (talk | contribs)
No edit summary
 
(239 intermediate revisions by the same user not shown)
Line 1: Line 1:
== Yesterday: ==
== Yesterday ==


* Emailed RG, KO about seismogram merging in pipeline
* Looked for obs data for NR event
* Resolved issue with BBToolbox and UCSB pipeline
** Forward station list table to CG
** Use a simpler CopySeismograms module instead of the GP Merge
* Mtg with CG regarding BBP issues
** 20% less data generated (SDSU)
* Site response changes
* Updated gen_html module
** Surveyed current site response methods on BBP
** Generates table with simulation results and per-station data
** Make available to all methods
** Always runs (user not asked anymore)
** Updated acceptance tests generator to comply with this
* Got one of JC srfs
** generated plot with BB code
** generated plot with JC's matlab script
** Results different


== Today: ==
== Today ==


* Contact JC about his SRF files
* Finish site response changes
** Visit tomorrow?
** Maintain existing workflow
* Run unit tests, acceptance tests
** Need to run differently for GP/IRIKURA/SONG versus SDSU/UCSB/EXSIM
* Add Kappa as a velocity model parameter
* Update wiki page for multi-segment ruptures
** Change hfsim, bbtoolbox (maybe other) modules to use it
** Add diagram
* Run BBToolbox and GP full validation with new kappa for LOMAP
* Review High-F package from SA
* Try running LOMAP on hypocenter cluster


== Blocked: ==
== Blocked: ==
* No
* No


== Followups: ==
== Followups: ==
* Cybershake call @ 11am
 
* No
 
== To Do: ==
 
=== Short Term ===
 
==== Broadband Platform ====
 
* BBP Code updates needed before git migration
** Move to argparse
** Simplify tests to use smaller files
** Remove unused data files in tests directory
 
* NGA-West 2 validation on BBP - Total: 6 days
** Contact CG, collect input scenarios: 1 day
** Write test code: 1 day
** Run tests: 2 days
** Review results: 2 days
 
=== Medium Term ===
 
* Package GF generation code from RG into BBP Platform
* New raytracing code for SDSU method
* Update Anderson method
* BBP Projects
* Try logging into Gordon

Latest revision as of 17:48, 26 September 2016

Yesterday

  • Looked for obs data for NR event
    • Forward station list table to CG
  • Mtg with CG regarding BBP issues
  • Site response changes
    • Surveyed current site response methods on BBP
    • Make available to all methods

Today

  • Finish site response changes
    • Maintain existing workflow
    • Need to run differently for GP/IRIKURA/SONG versus SDSU/UCSB/EXSIM
  • Update wiki page for multi-segment ruptures
    • Add diagram
  • Review High-F package from SA

Blocked:

  • No

Followups:

  • No

To Do:

Short Term

Broadband Platform

  • BBP Code updates needed before git migration
    • Move to argparse
    • Simplify tests to use smaller files
    • Remove unused data files in tests directory
  • NGA-West 2 validation on BBP - Total: 6 days
    • Contact CG, collect input scenarios: 1 day
    • Write test code: 1 day
    • Run tests: 2 days
    • Review results: 2 days

Medium Term

  • Package GF generation code from RG into BBP Platform
  • New raytracing code for SDSU method
  • Update Anderson method
  • BBP Projects
  • Try logging into Gordon