Staff Priorities - Fabio: Difference between revisions

From SCECpedia
Jump to navigationJump to search
Fsilva (talk | contribs)
No edit summary
Fsilva (talk | contribs)
No edit summary
 
(237 intermediate revisions by the same user not shown)
Line 1: Line 1:
== Yesterday: ==
== Yesterday ==


* Finished testing KML code, looks good
* Looked for obs data for NR event
* All unit tests pass
** Forward station list table to CG
* All acceptance tests pass
* Mtg with CG regarding BBP issues
* Generated new station files for UCSB/SDSU
* Site response changes
* Ran full validations for SDSU/UCSB/GP
** Surveyed current site response methods on BBP
** All pass LOMAP, NR
** Make available to all methods
** SDSU fails Landers (multi plane SRF)
** UCSB fails Landers (ran twice)
* Ran more tests on Epicenter
** Node-14 died again (weird disk error, sent e-mail JY)
* Broadband science call
** Received Northridge/Whittier files from CG


== Today: ==
== Today ==


* Set up Northridge/Whittier velocity models/validation packages
* Finish site response changes
* Set up Broadband on user accounts on epicenter
** Maintain existing workflow
* Write release documentation for 12.10.0
** Need to run differently for GP/IRIKURA/SONG versus SDSU/UCSB/EXSIM
* Update wiki page for multi-segment ruptures
** Add diagram
* Review High-F package from SA


== Blocked: ==
== Blocked: ==
* No
* No


== Followups: ==
== Followups: ==
* No
* No
== To Do: ==
=== Short Term ===
==== Broadband Platform ====
* BBP Code updates needed before git migration
** Move to argparse
** Simplify tests to use smaller files
** Remove unused data files in tests directory
* NGA-West 2 validation on BBP - Total: 6 days
** Contact CG, collect input scenarios: 1 day
** Write test code: 1 day
** Run tests: 2 days
** Review results: 2 days
=== Medium Term ===
* Package GF generation code from RG into BBP Platform
* New raytracing code for SDSU method
* Update Anderson method
* BBP Projects
* Try logging into Gordon

Latest revision as of 17:48, 26 September 2016

Yesterday

  • Looked for obs data for NR event
    • Forward station list table to CG
  • Mtg with CG regarding BBP issues
  • Site response changes
    • Surveyed current site response methods on BBP
    • Make available to all methods

Today

  • Finish site response changes
    • Maintain existing workflow
    • Need to run differently for GP/IRIKURA/SONG versus SDSU/UCSB/EXSIM
  • Update wiki page for multi-segment ruptures
    • Add diagram
  • Review High-F package from SA

Blocked:

  • No

Followups:

  • No

To Do:

Short Term

Broadband Platform

  • BBP Code updates needed before git migration
    • Move to argparse
    • Simplify tests to use smaller files
    • Remove unused data files in tests directory
  • NGA-West 2 validation on BBP - Total: 6 days
    • Contact CG, collect input scenarios: 1 day
    • Write test code: 1 day
    • Run tests: 2 days
    • Review results: 2 days

Medium Term

  • Package GF generation code from RG into BBP Platform
  • New raytracing code for SDSU method
  • Update Anderson method
  • BBP Projects
  • Try logging into Gordon