Staff Priorities - Fabio: Difference between revisions

From SCECpedia
Jump to navigationJump to search
Fsilva (talk | contribs)
No edit summary
Fsilva (talk | contribs)
No edit summary
 
(204 intermediate revisions by the same user not shown)
Line 1: Line 1:
== Yesterday: ==
== Yesterday ==


* Running Tottori and Niigata on epicenter
* Looked for obs data for NR event
** Niigata almost complete, Tottori queued up
** Forward station list table to CG
** Need Improve arias duration processing
* Mtg with CG regarding BBP issues
* Set up broadband for RS to use on epicenter
* Site response changes
** Ran to collect data for code improvements
** Surveyed current site response methods on BBP
* Finished broadband workflow 'resume' feature
** Make available to all methods
** Simple way to resume (or restart a workflow) from a particular module


== Today: ==
== Today ==


* Monitor Tottori and Niigata runs on epicenter
* Finish site response changes
** Possible issue with simulation duration
** Maintain existing workflow
* Call with JC to discuss running GMPEs with UCSB code
** Need to run differently for GP/IRIKURA/SONG versus SDSU/UCSB/EXSIM
* Look into ways to improve arias duration calculation performance
* Update wiki page for multi-segment ruptures
* Continue ExSim integration
** Add diagram
** Work on workflow generator
* Review High-F package from SA


== Blocked: ==
== Blocked: ==
* No
* No


== Followups: ==
== Followups: ==
* Call with JC @ 11am
 
* No
 
== To Do: ==
 
=== Short Term ===
 
==== Broadband Platform ====
 
* BBP Code updates needed before git migration
** Move to argparse
** Simplify tests to use smaller files
** Remove unused data files in tests directory
 
* NGA-West 2 validation on BBP - Total: 6 days
** Contact CG, collect input scenarios: 1 day
** Write test code: 1 day
** Run tests: 2 days
** Review results: 2 days
 
=== Medium Term ===
 
* Package GF generation code from RG into BBP Platform
* New raytracing code for SDSU method
* Update Anderson method
* BBP Projects
* Try logging into Gordon

Latest revision as of 17:48, 26 September 2016

Yesterday

  • Looked for obs data for NR event
    • Forward station list table to CG
  • Mtg with CG regarding BBP issues
  • Site response changes
    • Surveyed current site response methods on BBP
    • Make available to all methods

Today

  • Finish site response changes
    • Maintain existing workflow
    • Need to run differently for GP/IRIKURA/SONG versus SDSU/UCSB/EXSIM
  • Update wiki page for multi-segment ruptures
    • Add diagram
  • Review High-F package from SA

Blocked:

  • No

Followups:

  • No

To Do:

Short Term

Broadband Platform

  • BBP Code updates needed before git migration
    • Move to argparse
    • Simplify tests to use smaller files
    • Remove unused data files in tests directory
  • NGA-West 2 validation on BBP - Total: 6 days
    • Contact CG, collect input scenarios: 1 day
    • Write test code: 1 day
    • Run tests: 2 days
    • Review results: 2 days

Medium Term

  • Package GF generation code from RG into BBP Platform
  • New raytracing code for SDSU method
  • Update Anderson method
  • BBP Projects
  • Try logging into Gordon