== Yesterday: ==
== Yesterday ==


* Worked on BBP 13.6.0 distribution
* Looked for obs data for NR event
* Received Japan parameters from EXSIM, CSM, SDSU
** Forward station list table to CG
* Received Tottori new SRC file from PS
* Mtg with CG regarding BBP issues
* Integrated UCSB code into BBP platform
* Site response changes
** Call with JC about integration and other issues
** Surveyed current site response methods on BBP
** GFs for NoCal, SoCal, Mojave
** Make available to all methods
** Test runs on BBP and epicenter
* Ran Niigata test run for SDSU, sent results to KO, RT
* Contacted each modeling group wrt 13.6 re-runs


== Today: ==
== Today ==


* Compare 13.5 and 13.6 test runs
* Finish site response changes
* Create run chart for 13.6
** Maintain existing workflow
* Priority is UCSB, Japan for everybody, and other re-run requests
** Need to run differently for GP/IRIKURA/SONG versus SDSU/UCSB/EXSIM
* Possible NPS re-run for everybody
* Update wiki page for multi-segment ruptures
* Prepare for 13.6 runs
** Add diagram
** Clean up hypocenter/epicenter old runs
* Review High-F package from SA


== Blocked: ==
== Blocked: ==
* No
* No


== Followups: ==
== Followups: ==
* No
* No
== To Do: ==
=== Short Term ===
==== Broadband Platform ====
* BBP Code updates needed before git migration
** Move to argparse
** Simplify tests to use smaller files
** Remove unused data files in tests directory
* NGA-West 2 validation on BBP - Total: 6 days
** Contact CG, collect input scenarios: 1 day
** Write test code: 1 day
** Run tests: 2 days
** Review results: 2 days
=== Medium Term ===
* Package GF generation code from RG into BBP Platform
* New raytracing code for SDSU method
* Update Anderson method
* BBP Projects
* Try logging into Gordon

Latest revision as of 17:48, 26 September 2016

Yesterday

  • Looked for obs data for NR event
    • Forward station list table to CG
  • Mtg with CG regarding BBP issues
  • Site response changes
    • Surveyed current site response methods on BBP
    • Make available to all methods

Today

  • Finish site response changes
    • Maintain existing workflow
    • Need to run differently for GP/IRIKURA/SONG versus SDSU/UCSB/EXSIM
  • Update wiki page for multi-segment ruptures
    • Add diagram
  • Review High-F package from SA

Blocked:

  • No

Followups:

  • No

To Do:

Short Term

Broadband Platform

  • BBP Code updates needed before git migration
    • Move to argparse
    • Simplify tests to use smaller files
    • Remove unused data files in tests directory
  • NGA-West 2 validation on BBP - Total: 6 days
    • Contact CG, collect input scenarios: 1 day
    • Write test code: 1 day
    • Run tests: 2 days
    • Review results: 2 days

Medium Term

  • Package GF generation code from RG into BBP Platform
  • New raytracing code for SDSU method
  • Update Anderson method
  • BBP Projects
  • Try logging into Gordon