Staff Priorities - Fabio: Difference between revisions

From SCECpedia
Jump to navigationJump to search
Fsilva (talk | contribs)
No edit summary
Fsilva (talk | contribs)
No edit summary
 
(149 intermediate revisions by the same user not shown)
Line 1: Line 1:
== Yesterday: ==
== Yesterday ==


* Generated comparison runs for GP using 325s and 409s seismograms
* Looked for obs data for NR event
** Identical results
** Forward station list table to CG
* Repeated comparison runs for SDSU method
* Mtg with CG regarding BBP issues
** Very different results
* Site response changes
** Sent e-mail to KO, RT with problem description and examples
** Surveyed current site response methods on BBP
* Ran Loma Prieta and Northridge events for CSM method
** Make available to all methods
** LP finished fine, NR had problems
** Fixed station list limit, restarted NR
* Started LP and NR for UCSB method
* BBP meeting with PM
* Problems running KW's new runs
** Sent her e-mail to correct input files
* Updated several trac tickets
* Worked with JY to get epicenter cluster back
** Cluster is online and ready for use


== Today: ==
== Today ==


* Check results of UCSB, CSM Loma Prieta and Northridge runs
* Finish site response changes
* Start splay fault scenarios upon receiving updated station lists from KW
** Maintain existing workflow
* Help KO and RT debug seismogram issue with BBToolbox
** Need to run differently for GP/IRIKURA/SONG versus SDSU/UCSB/EXSIM
* Work on pending trac tickets (various small bugs and features)
* Update wiki page for multi-segment ruptures
* Talk to PM to select features wanted for BBP release
** Add diagram
* Review High-F package from SA


== Blocked: ==
== Blocked: ==
* No
* No


== Followups: ==
== Followups: ==
* Go through trac tickets with PM @ TBD
 
* No
 
== To Do: ==
 
=== Short Term ===
 
==== Broadband Platform ====
 
* BBP Code updates needed before git migration
** Move to argparse
** Simplify tests to use smaller files
** Remove unused data files in tests directory
 
* NGA-West 2 validation on BBP - Total: 6 days
** Contact CG, collect input scenarios: 1 day
** Write test code: 1 day
** Run tests: 2 days
** Review results: 2 days
 
=== Medium Term ===
 
* Package GF generation code from RG into BBP Platform
* New raytracing code for SDSU method
* Update Anderson method
* BBP Projects
* Try logging into Gordon

Latest revision as of 17:48, 26 September 2016

Yesterday

  • Looked for obs data for NR event
    • Forward station list table to CG
  • Mtg with CG regarding BBP issues
  • Site response changes
    • Surveyed current site response methods on BBP
    • Make available to all methods

Today

  • Finish site response changes
    • Maintain existing workflow
    • Need to run differently for GP/IRIKURA/SONG versus SDSU/UCSB/EXSIM
  • Update wiki page for multi-segment ruptures
    • Add diagram
  • Review High-F package from SA

Blocked:

  • No

Followups:

  • No

To Do:

Short Term

Broadband Platform

  • BBP Code updates needed before git migration
    • Move to argparse
    • Simplify tests to use smaller files
    • Remove unused data files in tests directory
  • NGA-West 2 validation on BBP - Total: 6 days
    • Contact CG, collect input scenarios: 1 day
    • Write test code: 1 day
    • Run tests: 2 days
    • Review results: 2 days

Medium Term

  • Package GF generation code from RG into BBP Platform
  • New raytracing code for SDSU method
  • Update Anderson method
  • BBP Projects
  • Try logging into Gordon