Staff Priorities - Phil: Difference between revisions

From SCECpedia
Jump to navigationJump to search
Maechlin (talk | contribs)
No edit summary
Maechlin (talk | contribs)
 
(469 intermediate revisions by the same user not shown)
Line 1: Line 1:
== Yesterday: ==
== Project/Product Backlog ==
* Scheduled CS Science Review
* Prepare Data Management talk for GMSV
* EC Draft Update
* Schedule PE's
* INCITE 2013 Final Report Draft
*
* Schedule High-F Call
* Staff meeting


== Today: ==
== Related Entries ==
* INCITE Final Report Draft out
*[[CME Project]]
* Web meeting  (10:30am)
*[[Staff]]
* High-F Call (11am)
* CyberShake Science Call (11:30am)
* Blue Waters Metrics one-pager
* Send out SEISM Call Announcement
* PC Final Reviews
 
== Blocked: ==
* No
 
== Followups: ==
* BBP Med-term discussion
* UCVM Meeting Wed (9am)
 
== Pending: ==
* Confirm SI2 meeting
* CS parallelism discussion with SC
* FW ABF into CME codebase
* Formalize the simulation plans for NR
* Find images from CMU of circular GTL structures
* Security Discussion with SC
* Backup strategy with group
* Setup license meeting with Stevens USC
* Create Storage Map for SCEC Storage (SC)
* Updated BBP and UCVM required docs to include "known problems" file

Latest revision as of 23:42, 31 January 2018

Project/Product Backlog

  • Prepare Data Management talk for GMSV
  • Schedule PE's

Related Entries