Staff Priorities - Scott: Difference between revisions

From SCECpedia
Jump to navigationJump to search
Scottcal (talk | contribs)
No edit summary
Scottcal (talk | contribs)
No edit summary
 
(521 intermediate revisions by the same user not shown)
Line 1: Line 1:
== Yesterday ==
== Current Items ==
*Found issue in DAX generator, implemented workaround
*Modify CyberShake to work on RSQSim ruptures
*Found problem in AWP SGTs from USC test; added new check, resubmitted
**Modify PreSGT step to determine list of points to save SGTs for from RSQSim rupture files
*Ran verification curves for CVM-H, no GTL, on CPU
*CyberShake training
*Ran verification curves for CVM-S4.26, CPU, calculated comparisons and put on wiki
*Update CyberShake study wiki pages to point to SQLite files
*Queued verification curves for BBP1D, GPU; CVM-S4.26, GPU
*Create wiki page for CyberShake RSQSim, and upload sample seismograms


== Today ==
== Project Backlog ==
*Monitor BBP 1D runs, CVM-S4.26 GPU runs
*Run CyberShake post-processing on RSQSim events, once DB is populated
*Incorporate readiness review changes
*Produce candidate site list for Bay Area CyberShake
*Calculate comp curves for CVM-H, no GTL, put on wiki
*Investigate improved load-balancing for DirectSynth SGT handlers
*Try 7x PP test on BW
*Experiment with OMP parallelization for post-processing
*Make sure most recent versions of all codes are checked into SVN
*Test Efecan's new CPU code for performance (and correctness)
*BW scheduled downtime Monday AM-Tuesday AM next week
 
== Blocked ==
*No
 
== Follow-ups ==
*Space meeting at 2 PST
 
== Areas of Responsibilities ==
* CyberShake
* Broadband CyberShake
* Code migration

Latest revision as of 17:56, 1 February 2018

Current Items

  • Modify CyberShake to work on RSQSim ruptures
    • Modify PreSGT step to determine list of points to save SGTs for from RSQSim rupture files
  • CyberShake training
  • Update CyberShake study wiki pages to point to SQLite files
  • Create wiki page for CyberShake RSQSim, and upload sample seismograms

Project Backlog

  • Run CyberShake post-processing on RSQSim events, once DB is populated
  • Produce candidate site list for Bay Area CyberShake
  • Investigate improved load-balancing for DirectSynth SGT handlers
  • Experiment with OMP parallelization for post-processing