Staff Priorities - David: Difference between revisions

From SCECpedia
Jump to navigationJump to search
Davidgil (talk | contribs)
Maechlin (talk | contribs)
Replaced content with "== Followups == * No"
 
(46 intermediate revisions by one other user not shown)
Line 1: Line 1:
== Yesterday ==
- High-F call @ 11am<br />
- Finished prototype for import script<br />
&nbsp;&nbsp;&nbsp;&nbsp;- Still missing PDFs but looking to test functionality<br />
- Finished permissions for proposals<br />
&nbsp;&nbsp;&nbsp;&nbsp;- Similar to pubs permissions<br />
- Fixed various bugs<br />
== Today ==
- Web call @ 1pm<br />
- Deploy to aftershock before call<br />
- Create top bar for proposal system to jump between steps<br />
- Enhance budget page as per TH discussions<br />
- Import and secure PDFs (url alias changes)<br />
- Fix dashboard search parameters to work<br />
== Blocked ==
- No
== Followups ==  
== Followups ==  


- One call
* No

Latest revision as of 16:47, 26 May 2017

Followups

  • No