Staff Priorities - David: Difference between revisions

From SCECpedia
Jump to navigationJump to search
Davidgil (talk | contribs)
No edit summary
Maechlin (talk | contribs)
Replaced content with "== Followups == * No"
 
(13 intermediate revisions by one other user not shown)
Line 1: Line 1:
== Yesterday ==
== Followups ==  
 
* Fixed SM issue:
** Fortran string length, plus null termination
* Started looking into replicating EL plots<br />
 
== Today ==
 
* Sent plots to CG<br />
* Verify 1D profile for UCVM (SCEC 1D)<br />
* Replicate EL plots (faults)<br />
* Test UCVM elevation, depth capabilities<br />
* Check remaining models into GitHub<br />
* High-F call at 11am
 
== Blocked ==


* No
* No
== Followups ==
* High-F call

Latest revision as of 16:47, 26 May 2017

Followups

  • No