Staff Priorities - Fabio: Difference between revisions

From SCECpedia
Jump to navigationJump to search
Fsilva (talk | contribs)
No edit summary
Fsilva (talk | contribs)
No edit summary
 
Line 1: Line 1:
== Yesterday ==
== Yesterday ==


* FAS code phase 2
* Looked for obs data for NR event
** Received updated instructions with examples from JB
** Forward station list table to CG
** Calculate EAS and smoothed EAS
* Mtg with CG regarding BBP issues
** Plot along with NS/EW components
* Site response changes
* Call with RT regarding High-F next steps
** Surveyed current site response methods on BBP
* Call with PM regarding progress and priorities
** Make available to all methods
* Updates to BBP / Test cases


== Today ==
== Today ==


* Finish FAS phase 2 code implementation
* Finish site response changes
** Report to results to JB
** Maintain existing workflow
* Work on High-F GOF codes
** Need to run differently for GP/IRIKURA/SONG versus SDSU/UCSB/EXSIM
* Update workflow generator to support multi-segment ruptures
* Update wiki page for multi-segment ruptures
** Add diagram
* Review High-F package from SA


== Blocked: ==
== Blocked: ==
Line 31: Line 32:


* BBP Code updates needed before git migration
* BBP Code updates needed before git migration
** Remove GMT dependencies and files
** Move to argparse
** Move to argparse
** Simplify tests to use smaller files
** Simplify tests to use smaller files
Line 41: Line 41:
** Run tests: 2 days
** Run tests: 2 days
** Review results: 2 days
** Review results: 2 days
==== High-F ====
* Set up High-F code repository - Total: 3 days
** Collect codes from groups, scripts - 1 day
** Select SVN/Github repository - 1 day
** Create repository - 1 day


=== Medium Term ===
=== Medium Term ===

Latest revision as of 17:48, 26 September 2016

Yesterday

  • Looked for obs data for NR event
    • Forward station list table to CG
  • Mtg with CG regarding BBP issues
  • Site response changes
    • Surveyed current site response methods on BBP
    • Make available to all methods

Today

  • Finish site response changes
    • Maintain existing workflow
    • Need to run differently for GP/IRIKURA/SONG versus SDSU/UCSB/EXSIM
  • Update wiki page for multi-segment ruptures
    • Add diagram
  • Review High-F package from SA

Blocked:

  • No

Followups:

  • No

To Do:

Short Term

Broadband Platform

  • BBP Code updates needed before git migration
    • Move to argparse
    • Simplify tests to use smaller files
    • Remove unused data files in tests directory
  • NGA-West 2 validation on BBP - Total: 6 days
    • Contact CG, collect input scenarios: 1 day
    • Write test code: 1 day
    • Run tests: 2 days
    • Review results: 2 days

Medium Term

  • Package GF generation code from RG into BBP Platform
  • New raytracing code for SDSU method
  • Update Anderson method
  • BBP Projects
  • Try logging into Gordon