Product Backlog - William: Difference between revisions

From SCECpedia
Jump to navigationJump to search
Wsavran (talk | contribs)
Wsavran (talk | contribs)
 
(42 intermediate revisions by the same user not shown)
Line 1: Line 1:
William Savran's Project/Product Backlog
William Savran's Project/Product Backlog


== Current Scrum ==
== Product Backlog ==
* produce a list containing status of all new Zealand forecasts and evaluations between 2007 - present
# research and develop new techniques for the rigorous statistical evaluation of stochastic event sets
** create data model
# reprocess missing one-day forecasts/evaluations identified from csep_db
** get sqlite tool
# provide open source codes for CSEP1 evaluations to begin modularizing current CSEP1 codebase
** implement mvp of data model
# create archived csep1 data set containing all data and meta-data from csep operational servers and provide to the community
*** build test data
# run 1-year u3etas and no-faultsETAS simulations from start of >Mw 2.5 catalog (~1985) until current day to provide data set for applying csep2 evaluations on stochastic event sets
*** import into data base using tool
# prototype tests of forecast of finite-ruptures, for example, in the ground motion domain
** write queries to test
# develop a protocol to accept external forecasts for CSEP testing
** publish code to github repository
# develop plan to ensure the continued prospective testing of csep1 models
** expand model to contain csep system
# develop blueprint to describe how to implement current on-demand CSEP 1 processing and reprocessing.
 
# write data management plan for the csep2 ecosystem.
== Project/Product Backlog ==
# implement restAPI to provide access to csep2 data archives.
* produce a list containing status of all new Zealand forecasts and evaluations for forecast period
* recompute incomplete/missing prospective new zealand forecasts and evaluations for forecast period
* provide curated tools for running CSEP evaluations and experiments outside of CSEP images
* provide method to access daily archived catalogs from SVN repository
 
== Detritus ==
* address SVN issue with localhost path to SVN server on csep-debug
* run forecast for global region on csep-debug to check how year breaks function
** run for 2007
** run for 2018
* brainstorm 5 year plans for CSEP2
* create scripts to find forecasts in data archives
* investigate how SVN works with EQ catalogs
** how do we query SVN for previous years using tags
 
== CSEP 5 Year Plan ==
<b>Immediate</b>
* Fix NZ STEP models. Target date: 1 March 2018.
* Verify CSEP results and data streams. Target date: 15 March 2018.
* Upgrade NZ CSEP version. Target date: 15 March 2018.
* Identify dependencies between NZ forecast groups. Target date: 15 March 2018.
* Identify dependencies between SCEC forecast groups. Target date: 15 March 2018.
<b>Near</b>
* Parallelise reprocessing. Target date: 15 April 2018.
* Complete reprocessing NZ and SCEC. Target date: 15 May 2018.
* Provide access tools to curated CSEP1.0 dataset. Target date: 1 June 2018.
<b>Far</b>
* Prototype (reprocessing) ensemble methods. Target date: 1 July 2018
* Process ensemble models in NZ and SCEC. Target date: 1 August 2018
* Publish results. Target submission date: 1 September 2018.
* Publish results. Target date: 1 November 2018


== Related Entries ==
== Related Entries ==
*[[CME Software Staff]]
*[[CME Software Staff]]
*[[CME Project]]
*[[CME Project]]

Latest revision as of 20:56, 11 January 2019

William Savran's Project/Product Backlog

Product Backlog

  1. research and develop new techniques for the rigorous statistical evaluation of stochastic event sets
  2. reprocess missing one-day forecasts/evaluations identified from csep_db
  3. provide open source codes for CSEP1 evaluations to begin modularizing current CSEP1 codebase
  4. create archived csep1 data set containing all data and meta-data from csep operational servers and provide to the community
  5. run 1-year u3etas and no-faultsETAS simulations from start of >Mw 2.5 catalog (~1985) until current day to provide data set for applying csep2 evaluations on stochastic event sets
  6. prototype tests of forecast of finite-ruptures, for example, in the ground motion domain
  7. develop a protocol to accept external forecasts for CSEP testing
  8. develop plan to ensure the continued prospective testing of csep1 models
  9. develop blueprint to describe how to implement current on-demand CSEP 1 processing and reprocessing.
  10. write data management plan for the csep2 ecosystem.
  11. implement restAPI to provide access to csep2 data archives.

Related Entries