Staff Priorities - Fabio: Difference between revisions

From SCECpedia
Jump to navigationJump to search
Maechlin (talk | contribs)
Created page with '*Yesterday: *Today: *Blocked: No *Followups: No'
 
Fsilva (talk | contribs)
No edit summary
 
(394 intermediate revisions by 2 users not shown)
Line 1: Line 1:
*Yesterday:
== Yesterday ==


*Today:
* Looked for obs data for NR event
** Forward station list table to CG
* Mtg with CG regarding BBP issues
* Site response changes
** Surveyed current site response methods on BBP
** Make available to all methods


== Today ==


*Blocked:
* Finish site response changes
    No
** Maintain existing workflow
** Need to run differently for GP/IRIKURA/SONG versus SDSU/UCSB/EXSIM
* Update wiki page for multi-segment ruptures
** Add diagram
* Review High-F package from SA


*Followups:
== Blocked: ==
    No
 
* No
 
== Followups: ==
 
* No
 
== To Do: ==
 
=== Short Term ===
 
==== Broadband Platform ====
 
* BBP Code updates needed before git migration
** Move to argparse
** Simplify tests to use smaller files
** Remove unused data files in tests directory
 
* NGA-West 2 validation on BBP - Total: 6 days
** Contact CG, collect input scenarios: 1 day
** Write test code: 1 day
** Run tests: 2 days
** Review results: 2 days
 
=== Medium Term ===
 
* Package GF generation code from RG into BBP Platform
* New raytracing code for SDSU method
* Update Anderson method
* BBP Projects
* Try logging into Gordon

Latest revision as of 17:48, 26 September 2016

Yesterday

  • Looked for obs data for NR event
    • Forward station list table to CG
  • Mtg with CG regarding BBP issues
  • Site response changes
    • Surveyed current site response methods on BBP
    • Make available to all methods

Today

  • Finish site response changes
    • Maintain existing workflow
    • Need to run differently for GP/IRIKURA/SONG versus SDSU/UCSB/EXSIM
  • Update wiki page for multi-segment ruptures
    • Add diagram
  • Review High-F package from SA

Blocked:

  • No

Followups:

  • No

To Do:

Short Term

Broadband Platform

  • BBP Code updates needed before git migration
    • Move to argparse
    • Simplify tests to use smaller files
    • Remove unused data files in tests directory
  • NGA-West 2 validation on BBP - Total: 6 days
    • Contact CG, collect input scenarios: 1 day
    • Write test code: 1 day
    • Run tests: 2 days
    • Review results: 2 days

Medium Term

  • Package GF generation code from RG into BBP Platform
  • New raytracing code for SDSU method
  • Update Anderson method
  • BBP Projects
  • Try logging into Gordon