Staff Priorities - Fabio: Difference between revisions

From SCECpedia
Jump to navigationJump to search
Fsilva (talk | contribs)
No edit summary
Fsilva (talk | contribs)
No edit summary
 
(289 intermediate revisions by the same user not shown)
Line 1: Line 1:
== Yesterday: ==
== Yesterday ==


* Got unit and acceptance tests to work again on trunk
* Looked for obs data for NR event
* Regenerated validation packages for all events
** Forward station list table to CG
* Checked in latest code
* Mtg with CG regarding BBP issues
* Started work on rotd50 integration for both observed and calculated seismograms
* Site response changes
* BBP science call
** Surveyed current site response methods on BBP
** Make available to all methods


== Today: ==
== Today ==


* Send e-mail to CG to discuss rotD50 details
* Finish site response changes
* Finish rotD50 module integration
** Maintain existing workflow
* Work on site correction module
** Need to run differently for GP/IRIKURA/SONG versus SDSU/UCSB/EXSIM
* Look into arias plots module
* Update wiki page for multi-segment ruptures
* Integrate new BBToolbox code into platform
** Add diagram
* Write script to run LOMAP full validation on HPCC
* Review High-F package from SA
* Test batching scripts with trunk
* Trac #131: Package new parallel running scripts and check them into svn as part of BBP
** Test new package with trunk


== Blocked: ==
== Blocked: ==
* No
* No


== Followups: ==
== Followups: ==
* No
* No
== To Do: ==
=== Short Term ===
==== Broadband Platform ====
* BBP Code updates needed before git migration
** Move to argparse
** Simplify tests to use smaller files
** Remove unused data files in tests directory
* NGA-West 2 validation on BBP - Total: 6 days
** Contact CG, collect input scenarios: 1 day
** Write test code: 1 day
** Run tests: 2 days
** Review results: 2 days
=== Medium Term ===
* Package GF generation code from RG into BBP Platform
* New raytracing code for SDSU method
* Update Anderson method
* BBP Projects
* Try logging into Gordon

Latest revision as of 17:48, 26 September 2016

Yesterday

  • Looked for obs data for NR event
    • Forward station list table to CG
  • Mtg with CG regarding BBP issues
  • Site response changes
    • Surveyed current site response methods on BBP
    • Make available to all methods

Today

  • Finish site response changes
    • Maintain existing workflow
    • Need to run differently for GP/IRIKURA/SONG versus SDSU/UCSB/EXSIM
  • Update wiki page for multi-segment ruptures
    • Add diagram
  • Review High-F package from SA

Blocked:

  • No

Followups:

  • No

To Do:

Short Term

Broadband Platform

  • BBP Code updates needed before git migration
    • Move to argparse
    • Simplify tests to use smaller files
    • Remove unused data files in tests directory
  • NGA-West 2 validation on BBP - Total: 6 days
    • Contact CG, collect input scenarios: 1 day
    • Write test code: 1 day
    • Run tests: 2 days
    • Review results: 2 days

Medium Term

  • Package GF generation code from RG into BBP Platform
  • New raytracing code for SDSU method
  • Update Anderson method
  • BBP Projects
  • Try logging into Gordon