Staff Priorities - David: Difference between revisions

From SCECpedia
Jump to navigationJump to search
Davidgil (talk | contribs)
Maechlin (talk | contribs)
Replaced content with "== Followups == * No"
 
(498 intermediate revisions by one other user not shown)
Line 1: Line 1:
== Yesterday ==
- CSDRS work<br />
&nbsp;&nbsp;&nbsp;&nbsp;- Request metadata<br />
&nbsp;&nbsp;&nbsp;&nbsp;- Cancel request<br />
&nbsp;&nbsp;&nbsp;&nbsp;- Selecting individual runs (almost done)<br />
&nbsp;&nbsp;&nbsp;&nbsp;- Bug fixes<br />
- CVM-H SM Basin<br />
&nbsp;&nbsp;&nbsp;&nbsp;- Verified cannot get different results<br />
- CyberShake Monitoring<br />
&nbsp;&nbsp;&nbsp;&nbsp;- Updated spreadsheet<br />
&nbsp;&nbsp;&nbsp;&nbsp;- Made section on wiki for status<br />
== Today ==
- CyberShake calls<br />
- CyberShake data site<br />
&nbsp;&nbsp;&nbsp;&nbsp;- Finish individual run selection<br />
&nbsp;&nbsp;&nbsp;&nbsp;- Desired hazard curve frequency list changes if broadband site included<br />
&nbsp;&nbsp;&nbsp;&nbsp;- Bug fixes<br />
&nbsp;&nbsp;&nbsp;&nbsp;- Would bring site to alpha release<br />
&nbsp;&nbsp;&nbsp;&nbsp;- Perhaps follow-up with SC and PM?<br />
- CVM-H SM Basin<br />
&nbsp;&nbsp;&nbsp;&nbsp;- Send off e-mail<br />
- CVM-S4.21 work<br />
&nbsp;&nbsp;&nbsp;&nbsp;- Resume work on this<br />
&nbsp;&nbsp;&nbsp;&nbsp;- Run PS's script to implement 21st perturbations<br />
== Blocked ==
- No
== Followups ==  
== Followups ==  


- CyberShake calls
* No
- PM

Latest revision as of 16:47, 26 May 2017

Followups

  • No