Staff Priorities - Phil: Difference between revisions

From SCECpedia
Jump to navigationJump to search
Maechlin (talk | contribs)
No edit summary
Maechlin (talk | contribs)
 
(499 intermediate revisions by the same user not shown)
Line 1: Line 1:
== Yesterday: ==
== Project/Product Backlog ==
* Review UCVM abstract
* Prepare Data Management talk for GMSV
* CME meeting schedule
* Schedule PE's
* DC Practice (Thursday 10:30am)
*
* Draft CME Meeting schedule
* Check PC Web docs
* Profile from JY
* Schedule meeting with Ewa (Jan 16)


== Today: ==
== Related Entries ==
* BBP Pub plan call scheduled (Fri 830am)
*[[CME Project]]
* YC storage call (11:30am)
*[[Staff]]
* DOE INCITE 2013 Final Report
* SCEC social media feedback
 
== Blocked: ==
* No
 
== Followups: ==
* No
 
== Pending: ==
* UCVM meeting ()
* CSEP Meeting ()
* UCERF Meeting ()
* FW ABF into CME codebase
* Formalize the simulation plans for NR
* Find images from CMU of circular GTL structures
* Security Discussion with SC
* Backup strategy with group
* Setup license meeting with Stevens USC
* Create Storage Map for SCEC Storage (SC)
* Updated BBP and UCVM required docs to include "known problems" file

Latest revision as of 23:42, 31 January 2018

Project/Product Backlog

  • Prepare Data Management talk for GMSV
  • Schedule PE's

Related Entries