Earthquake Response: Difference between revisions

From SCECpedia
Jump to navigationJump to search
Maechlin (talk | contribs)
No edit summary
Maechlin (talk | contribs)
No edit summary
 
(2 intermediate revisions by the same user not shown)
Line 1: Line 1:
'''Planning for ShakeOut'''
== Planning for ShakeOut ==
Plans for 2010 ShakeOut Response Planning. Tasks are described as (Local (people at SCEC) and Universal (people anywhere))


'''Earthquake Response Steps (Local/Universal)''
== Earthquake Response Steps (Local/Universal) ==
# Confirm operation of CISN Display at SCEC Headquarters (Local)
# Creation of Event Movie for ShakeOut Event (Universal)
## Recent Seismicity main-shock - 24 through mainshock
## Faults plots CFM faults
## Animation created
## Animation posted at


#Confirm Information from Public
*Information Display Available to SCEC HQ
##
**Confirm operation of CISN Display at SCEC Headquarters (Local)
 
**Creation of Event Movie for ShakeOut Event (Universal)
# Physical location of Servers to check on power supply (Local)
** Recent Seismicity main-shock - 24 through mainshock
## Physical inspection of server room (Local)
** Faults plots CFM faults
 
** Animation created and posted on public web site
 
**Confirm Information from Public through display of Broadcast news at SCEC HQ
'''Activities away from SCEC'''
*Inspection of Physical Servers  
#Login into Event Response Web Site
** Walk to to check on power supply (Local)
#Movie of rupture
** Physical inspection of server room (Local)
#Movie of earthquake
** Posting of Inspection posted
*Create of Event Movie for ShakeOut Event (Universal)
** Recent Seismicity main-shock - 24 through mainshock
** Faults plots CFM faults
** Animation created and posted in public site
*Collect Source Information
** ShakeMap instrumental intensity map
** Broadband seismogrrams from CyberShake rupture
** CyberShake rupture identified that matches event
** Convert SRF to Olsen source format
** Broadband to create waveform-based ShakeMap
** Finite focal mechansim for event
* Get Updated reports SCEC System
** OpenSHA ShakeMap
** CSEP forecast results
** EEW Report for this Event
** Run wave propagation simulation

Latest revision as of 17:57, 13 October 2010

Planning for ShakeOut

Plans for 2010 ShakeOut Response Planning. Tasks are described as (Local (people at SCEC) and Universal (people anywhere))

Earthquake Response Steps (Local/Universal)

  • Information Display Available to SCEC HQ
    • Confirm operation of CISN Display at SCEC Headquarters (Local)
    • Creation of Event Movie for ShakeOut Event (Universal)
    • Recent Seismicity main-shock - 24 through mainshock
    • Faults plots CFM faults
    • Animation created and posted on public web site
    • Confirm Information from Public through display of Broadcast news at SCEC HQ
  • Inspection of Physical Servers
    • Walk to to check on power supply (Local)
    • Physical inspection of server room (Local)
    • Posting of Inspection posted
  • Create of Event Movie for ShakeOut Event (Universal)
    • Recent Seismicity main-shock - 24 through mainshock
    • Faults plots CFM faults
    • Animation created and posted in public site
  • Collect Source Information
    • ShakeMap instrumental intensity map
    • Broadband seismogrrams from CyberShake rupture
    • CyberShake rupture identified that matches event
    • Convert SRF to Olsen source format
    • Broadband to create waveform-based ShakeMap
    • Finite focal mechansim for event
  • Get Updated reports SCEC System
    • OpenSHA ShakeMap
    • CSEP forecast results
    • EEW Report for this Event
    • Run wave propagation simulation