Staff Priorities - Phil: Difference between revisions

From SCECpedia
Jump to navigationJump to search
Maechlin (talk | contribs)
No edit summary
Maechlin (talk | contribs)
 
(474 intermediate revisions by the same user not shown)
Line 1: Line 1:
== Yesterday: ==
== Project/Product Backlog ==
* DOE INCITE 2013 Final Report w/ GE
* Prepare Data Management talk for GMSV
* DOE INCITE 2013 Final Report w/ PC
* Schedule PE's
* BBP 1D model follow-up with DG
*
* Coordinate EC Call with ED
* Review SRR from SC
** Requests: add CVM-H GTL Maps w/ test stations
** Requests: add 1D  plots w/ 1km transition to Moho


== Today: ==
== Related Entries ==
* Review TRR
*[[CME Project]]
* Review TRR from SC
*[[Staff]]
* EC Call with ED
* Update EC prospectus
* PC feedback
* Send out Geo/SI2 Call Announce
* TTI one pager
 
== Blocked: ==
* No
 
== Followups: ==
* Nvidia meeting at 1:30pm
 
== Pending: ==
* Confirm SI2 meeting
* CS parallelism discussion with SC
* FW ABF into CME codebase
* Formalize the simulation plans for NR
* Find images from CMU of circular GTL structures
* Security Discussion with SC
* Backup strategy with group
* Setup license meeting with Stevens USC
* Create Storage Map for SCEC Storage (SC)
* Updated BBP and UCVM required docs to include "known problems" file

Latest revision as of 23:42, 31 January 2018

Project/Product Backlog

  • Prepare Data Management talk for GMSV
  • Schedule PE's

Related Entries