Staff Priorities - Phil: Difference between revisions

From SCECpedia
Jump to navigationJump to search
Maechlin (talk | contribs)
No edit summary
Maechlin (talk | contribs)
No edit summary
Line 1: Line 1:
== Yesterday: ==
== Yesterday: ==
* Get updated SA binaries for SCEC
* Web call (10:30am)
* Missed CSEP Call (12noon)
* High-F call (11am)
* SCEC current HPCC Storage Map
* CyberShake (11:30am)
* Confirmed XAB travel plan [4/16 - 4/21]
* Admin coordination (1pm)
* Meeting on GTL and CVM-S5
* BW Abstract submitted
* Proposal development
* DIBBS Letter to ED


== Today: ==
== Today: ==
* Geo Call (11am)
* AWP to SRF Converter (11am)
* BW Call (1pm)
* Web Interview (4pm)
* Local SCEC Storage map
* Local SCEC Storage map
* Send SA User Display to TH
* Send SA User Display to TH
* Test seism email list
* Test seism email list
* Fix issues with Geo email list
* Fix issues with Geo email list
* get AWP to SRF converter from KBO
* Backup strategy with group
* Check whether new NGA relations are needed in BBP
* Develop BBP paper outline
* Return template to ED


== Blocked: ==
== Blocked: ==
Line 26: Line 23:


== Pending: ==
== Pending: ==
* Develop BBP paper outline
* GMPE New relations integrated into BBP
* FW ABF into CME codebase
* Setup license meeting with Stevens USC
* Setup license meeting with Stevens USC
* FW ABF into CME codebase
* Find images from CMU of circular GTL structures
* Find images from CMU of circular GTL structures
* Backup strategy with group
* Updated BBP and UCVM required docs to include "known problems" file
* Updated BBP and UCVM required docs to include "known problems" file

Revision as of 15:46, 9 April 2014

Yesterday:

  • Web call (10:30am)
  • High-F call (11am)
  • CyberShake (11:30am)
  • Admin coordination (1pm)
  • BW Abstract submitted
  • Proposal development
  • DIBBS Letter to ED

Today:

  • AWP to SRF Converter (11am)
  • Local SCEC Storage map
  • Send SA User Display to TH
  • Test seism email list
  • Fix issues with Geo email list
  • Backup strategy with group

Blocked:

  • No

Followups:

  • No

Pending:

  • Develop BBP paper outline
  • GMPE New relations integrated into BBP
  • FW ABF into CME codebase
  • Setup license meeting with Stevens USC
  • Find images from CMU of circular GTL structures
  • Updated BBP and UCVM required docs to include "known problems" file