Staff Priorities - Fabio: Difference between revisions

From SCECpedia
Jump to navigationJump to search
Fsilva (talk | contribs)
No edit summary
Fsilva (talk | contribs)
No edit summary
Line 1: Line 1:
== Yesterday ==
== Yesterday ==
* Finished all runs for 14.3 Study
* Spoke with SG regarding plots
** Sent link to modelers
* HF, CS calls
* Completed script to summarize results in table
* Started SWUS April 2014 Study
** Combined results first by station, then by period, as requested by CG
** https://scec.usc.edu/it/SWUS_GMC_SSHAC_-_April_2014_Simulations#Simulations_Using_Mode_1
* Talked to JY
** Completed all reverse, and most strike-slip scenarios
** bbpvault and epicenter-07 moved from intern lab to server room
** Started remaining scenarios
* Worked with KO regarding Japan results
* Ran single Tottori realization for KO, RT
** Started a couple of Niigata and Tottori calls
** Sent results
* Talked to JY regarding BBP backup drives
** Should be back online today/tomorrow


== Today ==
== Today ==
* Run alternative scenarios for RG
* Create plots for SG: NR, Tottori, 2 GMPEs
** Mineral, Saguenay
* Create tar files for SWUS scenario runs
* Create comparison tables for April 7th meeting
** Send link to KW, CA
* Talk to TH regarding wiki updates
* Finalize BBP 14.3 distribution


== Blocked: ==
== Blocked: ==
Line 19: Line 21:


== Followups: ==
== Followups: ==
* Geoinformatics call @ 11am
* No

Revision as of 16:56, 9 April 2014

Yesterday

Today

  • Create plots for SG: NR, Tottori, 2 GMPEs
  • Create tar files for SWUS scenario runs
    • Send link to KW, CA
  • Finalize BBP 14.3 distribution

Blocked:

  • No

Followups:

  • No