Staff Priorities - Phil: Difference between revisions

From SCECpedia
Jump to navigationJump to search
Maechlin (talk | contribs)
No edit summary
Maechlin (talk | contribs)
No edit summary
Line 1: Line 1:
== Yesterday: ==
== Yesterday: ==
* Web call (10:30am)
* High-F call (11am)
* CyberShake (11:30am)
* Admin coordination (1pm)
* BW Abstract submitted
* Proposal development
* DIBBS Letter to ED
== Today: ==
* AWP to SRF Converter (11am)
* AWP to SRF Converter (11am)
* Local SCEC Storage map
* Local SCEC Storage map
Line 15: Line 6:
* Fix issues with Geo email list
* Fix issues with Geo email list
* Backup strategy with group
* Backup strategy with group
== Today: ==


== Blocked: ==
== Blocked: ==

Revision as of 16:37, 10 April 2014

Yesterday:

  • AWP to SRF Converter (11am)
  • Local SCEC Storage map
  • Send SA User Display to TH
  • Test seism email list
  • Fix issues with Geo email list
  • Backup strategy with group

Today:

Blocked:

  • No

Followups:

  • No

Pending:

  • Develop BBP paper outline
  • GMPE New relations integrated into BBP
  • FW ABF into CME codebase
  • Setup license meeting with Stevens USC
  • Find images from CMU of circular GTL structures
  • Updated BBP and UCVM required docs to include "known problems" file