Staff Priorities - Phil: Difference between revisions

From SCECpedia
Jump to navigationJump to search
Maechlin (talk | contribs)
No edit summary
Maechlin (talk | contribs)
No edit summary
Line 1: Line 1:
== Yesterday: ==
== Yesterday: ==
* THJ Meeting
* THJ Call
* BB Paper authors and outline
* USR Paper review to JS
* SEISM Call
* BBP Paper work
* BBP Call w/ DD CG
* SCEC Status with TH
* ML and JY
* DOE email response
* NCSA Descriptions


== Today: ==
== Today: ==
* BBP proposal outline to TA
* BBP Call 2pm
* BBP Paper
* BBP Paper
* Schedule Proposal Call
* Schedule RG call on NCEE meeting
* TJ and YC prospectus review


== Blocked: ==
== Blocked: ==
Line 25: Line 25:
* GMPE New relations integrated into BBP
* GMPE New relations integrated into BBP
* FW ABF into CME codebase
* FW ABF into CME codebase
* Setup license meeting with Stevens USC
* Updated BBP and UCVM required docs to include "known problems" file
* Updated BBP and UCVM required docs to include "known problems" file

Revision as of 16:54, 11 June 2014

Yesterday:

  • THJ Call
  • USR Paper review to JS
  • BBP Paper work
  • SCEC Status with TH
  • DOE email response

Today:

  • BBP Paper
  • Schedule Proposal Call
  • Schedule RG call on NCEE meeting
  • TJ and YC prospectus review

Blocked:

  • No

Followups:

  • No

Pending:

  • SResponse
  • Post laptop storage table on wiki
  • Test seism email list
  • Fix issues with Geo email list
  • GMPE New relations integrated into BBP
  • FW ABF into CME codebase
  • Updated BBP and UCVM required docs to include "known problems" file