Staff Priorities - Phil: Difference between revisions
From SCECpedia
Jump to navigationJump to search
No edit summary |
No edit summary |
||
| Line 1: | Line 1: | ||
== Yesterday: == | == Yesterday: == | ||
* | * Office Move | ||
* BW Request Template | |||
* | |||
== Today: == | == Today: == | ||
* | * Check on BW Request status (file if not filed) | ||
* | * Follow-up on HPCC storage status | ||
* Confirm details of PEER work plan | |||
* Geoinfo report (June 15th) | |||
* SI2 Report (July 15th) | |||
* NCEE presentation (July 22) | |||
* PRAC Final Report | |||
* Check on BBP unsubscribe-all message | |||
* Update on Anderson method | |||
* New GMPE's into BBP | |||
* | |||
== Blocked: == | == Blocked: == | ||
Revision as of 16:30, 2 July 2014
Yesterday:
- Office Move
- BW Request Template
Today:
- Check on BW Request status (file if not filed)
- Follow-up on HPCC storage status
- Confirm details of PEER work plan
- Geoinfo report (June 15th)
- SI2 Report (July 15th)
- NCEE presentation (July 22)
- PRAC Final Report
- Check on BBP unsubscribe-all message
- Update on Anderson method
- New GMPE's into BBP
Blocked:
- No
Followups:
- No
Pending:
- SResponse
- Post laptop storage table on wiki
- Test seism email list
- Fix issues with Geo email list
- GMPE New relations integrated into BBP
- FW ABF into CME codebase
- Updated BBP and UCVM required docs to include "known problems" file