Staff Priorities - Phil: Difference between revisions

From SCECpedia
Jump to navigationJump to search
Maechlin (talk | contribs)
No edit summary
Maechlin (talk | contribs)
No edit summary
Line 1: Line 1:
== Yesterday: ==
== Yesterday: ==
* Office Moving
* BW Abstract (posted)
* Check on BW Request status
* Meeting with THJ on Priorities
* Follow-up on HPCC storage status
* GMSV/CME Meeting Planning Telecon
* UCVM review
* Hercules Meeting Follow-up
* Talked with Fabio about BBP-related issues including
* UCVM Paper Planning
** Update on Anderson method
* Check on MK Mantle Model
** New Feng's 2013 GMPE's into BBP
** New CG GMPE's into BBP
** Cumulative Summary Report Implementation
** Tracking "production run" requests


== Today: ==
== Today: ==
* BW Award abstract
* CME Meeting Agenda - Tuesday
* Confirm details of PEER work plan
* Coordinate Titan result - Monday
* Geoinfo report (June 15th)
* Catalina Meeting Response - Andreas - Monday
* Check with JS/AP/CT about Mantle Model
* BBP Hercules Planning Meeting
* Review NCEE Session Meeting Emails
* Give DG Archimedies an Etree Papers
* Confirm Filesystem migration (Friday) w/ group
* Confirm PEER work plan completed w/ THJ
* SI2 Report (July 15th)
* SI2 Report (July 15th)
* NCEE presentation (July 22)
* NCEE presentation (July 22)
* Software at intensity email list
* Test seism email list
* Test seism email list
* Fix issues with Geo email list
* Fix issues with Geo email list

Revision as of 16:59, 14 July 2014

Yesterday:

  • BW Abstract (posted)
  • Meeting with THJ on Priorities
  • GMSV/CME Meeting Planning Telecon
  • Hercules Meeting Follow-up
  • UCVM Paper Planning
  • Check on MK Mantle Model

Today:

  • CME Meeting Agenda - Tuesday
  • Coordinate Titan result - Monday
  • Catalina Meeting Response - Andreas - Monday
  • Check with JS/AP/CT about Mantle Model
  • BBP Hercules Planning Meeting
  • Review NCEE Session Meeting Emails
  • Give DG Archimedies an Etree Papers
  • Confirm Filesystem migration (Friday) w/ group
  • Confirm PEER work plan completed w/ THJ
  • SI2 Report (July 15th)
  • NCEE presentation (July 22)
  • Software at intensity email list
  • Test seism email list
  • Fix issues with Geo email list

Blocked:

  • No

Followups:

  • NCCS workflow call
  • BBP Telecon

Pending:

  • PRAC Final Report (Nov 15)
  • SResponse
  • Post laptop storage table on wiki
  • FW ABF into CME codebase
  • Updated BBP and UCVM required docs to include "known problems" file