Staff Priorities - Phil: Difference between revisions

From SCECpedia
Jump to navigationJump to search
Maechlin (talk | contribs)
No edit summary
Maechlin (talk | contribs)
No edit summary
Line 1: Line 1:
== Yesterday: ==
== Yesterday: ==
* BW Abstract (posted)
* Draft CME Meeting Agenda sent out
* Meeting with THJ on Priorities
* Hercules/BBP Meeting
* GMSV/CME Meeting Planning Telecon
* Titan Telecon scheduled
* Hercules Meeting Follow-up
* Catalina Meeting Response - Andreas - Monday
* UCVM Paper Planning
* Checked with JS/AP/CT about Mantle Model
* Check on MK Mantle Model
* Give DG Archimedies an Etree Papers
* Tracking down Software at intensity email list


== Today: ==
== Today: ==
* CME Meeting Agenda - Tuesday
* ERI Meeting
* Coordinate Titan result - Monday
* Finalize Agenda
* Catalina Meeting Response - Andreas - Monday
* High-F Call
* Check with JS/AP/CT about Mantle Model
* CyberShake Call
* BBP Hercules Planning Meeting
* Review NCEE Session Meeting Emails
* Give DG Archimedies an Etree Papers
* Confirm Filesystem migration (Friday) w/ group
* Confirm Filesystem migration (Friday) w/ group
* Review NCEE Session Meeting
* Confirm PEER work plan completed w/ THJ
* Confirm PEER work plan completed w/ THJ
* SI2 Report (July 15th)
* SI2 Report (July 15th)
* NCEE presentation (July 22)
* NCEE presentation (July 22)
* Software at intensity email list
* Test seism email list
* Test seism email list
* Fix issues with Geo email list
* Fix issues with Geo email list

Revision as of 17:02, 15 July 2014

Yesterday:

  • Draft CME Meeting Agenda sent out
  • Hercules/BBP Meeting
  • Titan Telecon scheduled
  • Catalina Meeting Response - Andreas - Monday
  • Checked with JS/AP/CT about Mantle Model
  • Give DG Archimedies an Etree Papers
  • Tracking down Software at intensity email list

Today:

  • ERI Meeting
  • Finalize Agenda
  • High-F Call
  • CyberShake Call
  • Confirm Filesystem migration (Friday) w/ group
  • Review NCEE Session Meeting
  • Confirm PEER work plan completed w/ THJ
  • SI2 Report (July 15th)
  • NCEE presentation (July 22)
  • Test seism email list
  • Fix issues with Geo email list

Blocked:

  • No

Followups:

  • NCCS workflow call
  • BBP Telecon

Pending:

  • PRAC Final Report (Nov 15)
  • SResponse
  • Post laptop storage table on wiki
  • FW ABF into CME codebase
  • Updated BBP and UCVM required docs to include "known problems" file