Staff Priorities - Scott: Difference between revisions

From SCECpedia
Jump to navigationJump to search
Scottcal (talk | contribs)
No edit summary
Scottcal (talk | contribs)
No edit summary
Line 1: Line 1:
== Yesterday ==
== Yesterday ==
*Submitted AGU and SCEC abstracts
*Resubmitted subworkflow for 1 Hz curve, almost finished, resubmitted
*Added TC entries for Titan
== Today ==
*Add SC entries for Titan
*Add SC entries for Titan
*Add Titan rupture geometries to RC
*Add Titan rupture geometries to RC
Line 10: Line 5:
*Test out Titan data transfer with USC SGTs
*Test out Titan data transfer with USC SGTs
*If subworkflow succeeds, then submit the other subworkflows
*If subworkflow succeeds, then submit the other subworkflows
== Today ==


== Blocked ==
== Blocked ==
Line 15: Line 13:


== Follow-ups ==
== Follow-ups ==
*Gideon to work through Titan pilots
*No


== Areas of Responsibilities ==
== Areas of Responsibilities ==

Revision as of 17:02, 8 August 2014

Yesterday

  • Add SC entries for Titan
  • Add Titan rupture geometries to RC
  • Create pilot job to reserve enough resources for TEST site
  • Test out Titan data transfer with USC SGTs
  • If subworkflow succeeds, then submit the other subworkflows

Today

Blocked

  • No

Follow-ups

  • No

Areas of Responsibilities

  • CyberShake
  • Broadband CyberShake
  • Code migration