Staff Priorities - David: Difference between revisions

From SCECpedia
Jump to navigationJump to search
Davidgil (talk | contribs)
Davidgil (talk | contribs)
Line 1: Line 1:
== Yesterday ==
== Yesterday ==


- Four calls<br />
- Committed initial Drupal site to GitHub<br />
&nbsp;&nbsp;&nbsp;&nbsp;- Web Dev<br />
- Wrote up instructions on  how to retrieve and install<br />
&nbsp;&nbsp;&nbsp;&nbsp;- High-F <br />
- Finalized straw-man dev/cert/operational paradigm<br />
&nbsp;&nbsp;&nbsp;&nbsp;- CyberShake calls<br />
- Tried to install SCEC-VDO on my laptop (summer school)<br />
- Wrote up proposed Drupal deployment options<br />
- Ensured gtl.usc.edu updates went well<br />
- PM meeting @ 2pm<br />
- Started write up on Drupal option<br />
- Heard back from MW. Installation of UCVM was successful.<br />
- ShakeOut work, FEMA statistics calculations<br />


== Today ==
== Today ==

Revision as of 17:06, 28 August 2014

Yesterday

- Committed initial Drupal site to GitHub
- Wrote up instructions on how to retrieve and install
- Finalized straw-man dev/cert/operational paradigm
- Tried to install SCEC-VDO on my laptop (summer school)
- Ensured gtl.usc.edu updates went well

Today

- Finish write up of proposed final Drupal option
- Also include write up of how to transfer web site between laptops
- Look into KVM image, how we can automate deployment

Blocked

- No

Followups

- No