Staff Priorities - Scott: Difference between revisions

From SCECpedia
Jump to navigationJump to search
Scottcal (talk | contribs)
No edit summary
Scottcal (talk | contribs)
No edit summary
Line 1: Line 1:
== Yesterday ==
== Yesterday ==
*Finished poster, integrated comments from Phil
*SCEC meeting
*Sent curves and disaggregation to Kim, as requested
*Modified parameters to rupture generator based on Rob's feedback


== Today ==
== Today ==
*Resubmit 1 Hz post-processing on Blue Waters
*Assemble new list of priorities based on SCEC meeting conversations
*Finish Titan post-processing
*Respond to Matt at ORNL about Titan workflow progress
*Fill out NSF demographic survey
*Submit new 1 Hz post-processing workflow on Blue Waters
*Queue 0.5 Hz, 200m spacing, new rupture generator curves for USC, PAS, WNGC, SBSM with both random and uniform spacing
*Look at BBP RotD50 code


== Blocked ==
== Blocked ==
*Rob to recommend fix seismogram synthesis resampling issue
*No


== Follow-ups ==
== Follow-ups ==

Revision as of 17:10, 11 September 2014

Yesterday

  • SCEC meeting
  • Modified parameters to rupture generator based on Rob's feedback

Today

  • Assemble new list of priorities based on SCEC meeting conversations
  • Respond to Matt at ORNL about Titan workflow progress
  • Submit new 1 Hz post-processing workflow on Blue Waters
  • Look at BBP RotD50 code

Blocked

  • No

Follow-ups

  • No

Areas of Responsibilities

  • CyberShake
  • Broadband CyberShake
  • Code migration