Staff Priorities - Scott: Difference between revisions

From SCECpedia
Jump to navigationJump to search
Scottcal (talk | contribs)
No edit summary
Scottcal (talk | contribs)
No edit summary
Line 3: Line 3:
*Worked on BBP RotD100 code; matched it to reference results, close to Baker RotD code also
*Worked on BBP RotD100 code; matched it to reference results, close to Baker RotD code also
*Seg faults in 1 Hz post-processing; possibly in kickstart?
*Seg faults in 1 Hz post-processing; possibly in kickstart?
*Call with Yifeng, Efecan, FP group


== Today ==
== Today ==

Revision as of 17:04, 22 September 2014

Yesterday

  • Confirmed that there's a discrepency with saved SGTs on Titan test
  • Worked on BBP RotD100 code; matched it to reference results, close to Baker RotD code also
  • Seg faults in 1 Hz post-processing; possibly in kickstart?
  • Call with Yifeng, Efecan, FP group

Today

  • Modify RotD100 code to take command-line arguments instead of file
  • Write code to read in seismogram files, call RotD100 code
  • Investigate seg faults with Gideon
  • Dig into saved SGT issue on Titan

Blocked

  • No

Follow-ups

  • No

Areas of Responsibilities

  • CyberShake
  • Broadband CyberShake
  • Code migration