Staff Priorities - Scott: Difference between revisions

From SCECpedia
Jump to navigationJump to search
Scottcal (talk | contribs)
No edit summary
Scottcal (talk | contribs)
No edit summary
Line 1: Line 1:
== Yesterday ==
== Yesterday ==
*Resubmitted 1 Hz post-processing; had X and Y headers flipped
*Developed script to calculate deterministic MCER results, did spot comparison to check
*Corresponded with CB Crouse
*Sent Kevin list of sites and locations
*Inserted RotD values for 13 UGMS sites
*Monitored 1 Hz post-processing, completed
*Queued comparison curve for Titan workflow


== Today ==
== Today ==
*Ping Nico about deterministic algorithm
*Start work to calculate deterministic MCER results
*Send Kevin list of sites and locations
*Monitor 1 Hz post-processing
*Determine cost of 1 Hz run
*Determine cost of 1 Hz run
*Send out 1 Hz results
*Compare Titan workflow results to reference solution
*Calculate probabilistic results for all 14 sites when 2008 and 2014 scaling factors are added by Kevin
*Calculate deterministic results for LADT along with comparison curves?


== Blocked ==
== Blocked ==
Line 16: Line 15:


== Follow-ups ==
== Follow-ups ==
*HighF
*Phil after call
*CyberShake calls


== Areas of Responsibilities ==
== Areas of Responsibilities ==

Revision as of 17:19, 8 October 2014

Yesterday

  • Developed script to calculate deterministic MCER results, did spot comparison to check
  • Sent Kevin list of sites and locations
  • Monitored 1 Hz post-processing, completed

Today

  • Determine cost of 1 Hz run
  • Send out 1 Hz results
  • Compare Titan workflow results to reference solution
  • Calculate probabilistic results for all 14 sites when 2008 and 2014 scaling factors are added by Kevin
  • Calculate deterministic results for LADT along with comparison curves?

Blocked

  • No

Follow-ups

  • Phil after call

Areas of Responsibilities

  • CyberShake
  • Broadband CyberShake
  • Code migration