Staff Priorities - David: Difference between revisions
From SCECpedia
Jump to navigationJump to search
| Line 1: | Line 1: | ||
== Yesterday == | == Yesterday == | ||
- | - Fixed a couple of bugs with the proposal details page<br /> | ||
- | - Large proposal not saving data<br /> | ||
- | - Turns out, we exceeded max post variables in PHP<br /> | ||
- | - Upped limit in configuration file<br /> | ||
- Disabled system user page<br /> | |||
- | - (Almost) finished the proposal review page<br /> | ||
- | - Sent off to Tran for very initial review<br /> | ||
- | - Imported short name list<br /> | ||
== Today == | == Today == | ||
Revision as of 18:09, 10 November 2014
Yesterday
- Fixed a couple of bugs with the proposal details page
- Large proposal not saving data
- Turns out, we exceeded max post variables in PHP
- Upped limit in configuration file
- Disabled system user page
- (Almost) finished the proposal review page
- Sent off to Tran for very initial review
- Imported short name list
Today
- Imported 3 new SCEC profiles
- TH is saying that large proposal, RH, not saving data
- Disable system user page as per TH
- Wrap up (hopefully) work on proposal review page
- Send off to TH
Blocked
- No
Followups
- No