Staff Priorities - Fabio: Difference between revisions

From SCECpedia
Jump to navigationJump to search
Fsilva (talk | contribs)
No edit summary
Fsilva (talk | contribs)
No edit summary
Line 1: Line 1:
== Yesterday ==
== Yesterday ==


* Call with JC
* Finalized BBP directory structure updates
** Received updated UCSB code
* Got final OK from JC for the UCSB code and parameters
** Examples, config files
* Testing pre-RC1 on HPCC
** new GFs
* Got all Unit/Acceptance tests to pass
** Talked about La Habra SRC file
* Coordinating with JY about epicenter drives
* Updated UCSB scientific modules
* Worked on BBP examples for First Simulations
* Call with JB, AS
* Mtg with JY about epicenter drives


== Today ==
== Today ==


* Finalize UCSB update (hopefully!)
* Finish BBP testing on HPCC
* Trac #283 - Modify validation packages to add common files directory
* Update Release Notes
* Trac #158 - Force use of BBP_DATA_DIR
* Update Mac OS X Installation Guide
* Trac #207 - Use real station distances
* Work on BBP User's Guide
   
   
== Blocked: ==
== Blocked: ==
Line 21: Line 19:


== Followups: ==
== Followups: ==
* JC regarding UCSB software update
* No

Revision as of 19:26, 9 March 2015

Yesterday

  • Finalized BBP directory structure updates
  • Got final OK from JC for the UCSB code and parameters
  • Testing pre-RC1 on HPCC
  • Got all Unit/Acceptance tests to pass
  • Coordinating with JY about epicenter drives
  • Worked on BBP examples for First Simulations

Today

  • Finish BBP testing on HPCC
  • Update Release Notes
  • Update Mac OS X Installation Guide
  • Work on BBP User's Guide

Blocked:

  • No

Followups:

  • No