Broadband Platform 15 3 0: Difference between revisions

From SCECpedia
Jump to navigationJump to search
Fsilva (talk | contribs)
Fsilva (talk | contribs)
Line 2: Line 2:




==== Week 1/26 ====
==== Week 1/30 ====


* <strike>Finalize Intel compiler dependency removal (#227, #228)</strike>
* <strike>Finalize Intel compiler dependency removal (#227, #228)</strike>
Line 9: Line 9:
* <strike>XML parsing problem (#285)</strike>
* <strike>XML parsing problem (#285)</strike>


==== Week 2/2 ====
==== Week 2/6 ====


* Run BBP on Mac OS X (#44) - 2 days
* Run BBP on Mac OS X (#44) - 2 days
Line 17: Line 17:
* <strike>Always use BBP_DATA_DIR (#158) - 1 day</strike>
* <strike>Always use BBP_DATA_DIR (#158) - 1 day</strike>


==== Week 2/9 ====
==== Week 2/13 ====


* Division by zero issue (#284) - 1 day
* Division by zero issue (#284) - 1 day
Line 27: Line 27:
* Update BBP distribution directory structure (#290) - 2 days
* Update BBP distribution directory structure (#290) - 2 days


==== Week 2/16 ====
==== Week 2/20 ====


* Run test simulations for modelers
* Run test simulations for modelers
Line 34: Line 34:
* Review test coverage (#128) - 2 days
* Review test coverage (#128) - 2 days


==== Week 2/23 ====
==== Week 2/27 ====


* Code Freeze for Modelers (2/23)
* Code Freeze for Modelers (2/23)
Line 43: Line 43:
* Start West Part A & B validation suite for all methods 2/27
* Start West Part A & B validation suite for all methods 2/27


==== Week 3/2 ====
==== Week 3/6 ====


* Make RC1 available to group for testing
* Make RC1 available to group for testing
* Collect feedback
* Collect feedback


==== Week 3/9 ====
==== Week 3/13 ====


* Code Review 3/9
* Code Review 3/9
* Make RC2 available to group
* Make RC2 available to group


==== Week 3/16 ====
==== Week 3/20 ====


* Collect feedback from group
* Collect feedback from group
* Fix eventual issues
* Fix eventual issues


==== Week 3/23 ====
==== Week 3/27 ====


* Generate Virtual Image
* Generate Virtual Image
Line 64: Line 64:
* Update online documentation
* Update online documentation


==== Week 3/30 ====
==== Week 3/31 ====


* Post Distribution on Hypocenter
* Post Distribution on Hypocenter

Revision as of 22:11, 6 February 2015

Release Plan for BBP 15.3.0

Week 1/30

  • Finalize Intel compiler dependency removal (#227, #228)
  • SRC/STL files on outdata (#277)
  • SEED on outdata html file (#276)
  • XML parsing problem (#285)

Week 2/6

  • Run BBP on Mac OS X (#44) - 2 days
  • Use real station distances (#207) - 1 day
  • Integrate updated method from UCSB (#289) - 3 day
  • Modify validation packages directory structure (#283) - 1 day
  • Always use BBP_DATA_DIR (#158) - 1 day

Week 2/13

  • Division by zero issue (#284) - 1 day
  • Match module works with user-provided seismograms (#265) - 1 day
  • Version number on XML file (#200) - 1 day
  • Fix Header in RD50 files (#270) - 1 day
  • Remove unused codes and data files (#287) - 1 day
  • Better handle errors/ctrl-C (#113) - 1 day
  • Update BBP distribution directory structure (#290) - 2 days

Week 2/20

  • Run test simulations for modelers
  • Update cluster scripts (#268) - 1 day
  • Improve BBP command-line interface (#291) - 1 day
  • Review test coverage (#128) - 2 days

Week 2/27

  • Code Freeze for Modelers (2/23)
  • BBP First simulations (#269) - 2 days
  • Documentation - 2 days
    • Mac OS X installation Guide
  • Code Freeze for SCEC (2/26)
  • Start West Part A & B validation suite for all methods 2/27

Week 3/6

  • Make RC1 available to group for testing
  • Collect feedback

Week 3/13

  • Code Review 3/9
  • Make RC2 available to group

Week 3/20

  • Collect feedback from group
  • Fix eventual issues

Week 3/27

  • Generate Virtual Image
  • Generate Tar files
  • Update online documentation

Week 3/31

  • Post Distribution on Hypocenter
  • Update Release Notes
  • Write Release Announcement
  • Email Release Announcement