Staff Priorities - Scott: Difference between revisions

From SCECpedia
Jump to navigationJump to search
Scottcal (talk | contribs)
No edit summary
Scottcal (talk | contribs)
No edit summary
Line 1: Line 1:
== Yesterday ==
== Yesterday ==
*Call with CB
*Monitored RotD insertion and calc
*Continued insertion and curve calc of RotD for Study 14.2
*Continued testing of 1 Hz workflows on Blue Waters - fixed some 1 Hz related bugs, restarted workflow
*Plotted spectral content of seismograms for filtering comparison
*Created and verified version of SGT header code on Titan to work around I/O problems
*Emailed with Kim to determine impact of FP on seismograms
*Responded to Jessica about hypocenters in Study 14.2
*Testing of 1 Hz workflows on Blue Waters
*Problem with serial I/O on Titan continues


== Today ==
== Today ==
*Monitor RotD insertion and calc
*Monitor RotD insertion and calc
*Continued testing of 1 Hz workflows on Blue Waters
*Monitor 1 Hz WNGC test on Titan
*Create MPI version of SGT header code to work around serial I/O problems
*Monitor 1 Hz SMCA test on Blue Waters
*Finish new 1 Hz WNGC test
*Gather seismograms for Glenn Biasi


== Blocked ==
== Blocked ==
Line 17: Line 15:


== Follow-ups ==
== Follow-ups ==
*possibly with Phil
*HighF call


== Areas of Responsibilities ==
== Areas of Responsibilities ==

Revision as of 17:13, 17 March 2015

Yesterday

  • Monitored RotD insertion and calc
  • Continued testing of 1 Hz workflows on Blue Waters - fixed some 1 Hz related bugs, restarted workflow
  • Created and verified version of SGT header code on Titan to work around I/O problems
  • Responded to Jessica about hypocenters in Study 14.2

Today

  • Monitor RotD insertion and calc
  • Monitor 1 Hz WNGC test on Titan
  • Monitor 1 Hz SMCA test on Blue Waters
  • Gather seismograms for Glenn Biasi

Blocked

  • No

Follow-ups

  • HighF call

Areas of Responsibilities

  • CyberShake
  • Broadband CyberShake
  • Code migration