Staff Priorities - Scott: Difference between revisions

From SCECpedia
Jump to navigationJump to search
Scottcal (talk | contribs)
No edit summary
Scottcal (talk | contribs)
No edit summary
Line 1: Line 1:
== Yesterday ==
== Yesterday ==
*CyberShake technical readiness review
*Updated science and technical reviews
*John upgraded Condor on shock to 8.2.8; fixed configuration problems
*Tested h2ologin4 once Tim has pushed through fix; works
*Titan pilot jobs stopped being able to communicated; could be firewall issue
*Fixed issues with Condor collector on shock
*Tested job submission to h2ologin4 test system, not working; could be issue with h2ologin4 configuration, emailed NCSA
*Emailed John M. to tell him about upcoming run
*Found bug in pegasus-rc-client, emailed ISI, pushed out fix
*Submitted test of one workflow, multiple sites
*Tested file transfer between ie06 test system and hpc-scec, worked


== Today ==
== Today ==
*Update science and technical reviews
*Communicate with NCSA and OLCF about planned run
*Test h2ologin4 once Tim has pushed through fix
*Monitor one workflow, multiple sites test
*Check shock firewall issue
*Prepare site list for auto-submit tool
*Communicate with NCSA, OLCF, and USC HPC about planned run


== Blocked ==
== Blocked ==

Revision as of 17:14, 13 April 2015

Yesterday

  • Updated science and technical reviews
  • Tested h2ologin4 once Tim has pushed through fix; works
  • Fixed issues with Condor collector on shock
  • Emailed John M. to tell him about upcoming run
  • Submitted test of one workflow, multiple sites

Today

  • Communicate with NCSA and OLCF about planned run
  • Monitor one workflow, multiple sites test
  • Prepare site list for auto-submit tool

Blocked

  • No

Follow-ups

  • No

Areas of Responsibilities

  • CyberShake
  • Broadband CyberShake
  • Code migration