Staff Priorities - Kevin: Difference between revisions

From SCECpedia
Jump to navigationJump to search
Kmilner (talk | contribs)
No edit summary
Kmilner (talk | contribs)
No edit summary
Line 1: Line 1:
8/3/15
8/4/15


== Yesterday: ==
== Yesterday: ==
* did spectral analysis on UCERF3-TD based synthetic catalogs
* first draft of supercycle AGU abstract, sent to Tom
* helped Ned speed up ETAS diagnostics code by ignoring contribution below a fractional threshold
* got UCERF3 synthetic catalogs into format required for synchronization analysis code (from masters thesis), ran analysis
* finished directivity model validation and regenerated CyberShake-OEF maps
* worked on 45 degree rotation algorithm to plot only data along the diagonal of recurrence plots


== Today: ==
== Today: ==
* pick AGU session and write first draft of abstract, send to Tom
* finalize AGU abstract with Tom, submit
* run simulator synchronization analysis on UCERF3-TD catalog
* register for SCEC annual meeting
** will require code rewrites to make synch code more general, get UCERF3 data into format which will work for simulators
* finish recurrence plot rotation work, make plots for UCERF3-TD


== Blocked: ==
== Blocked: ==
Line 15: Line 15:


== Followups: ==
== Followups: ==
no
* broadband cybershake call at 11:30




== Lower priority or longer term tasks ==
== Lower priority or longer term tasks ==
* Fill in missing site/rupture distances in CyberShake DB for ERF 36 (200m)
* Fill in missing site/rupture distances in CyberShake DB for ERF 36 (200m)

Revision as of 17:25, 4 August 2015

8/4/15

Yesterday:

  • first draft of supercycle AGU abstract, sent to Tom
  • got UCERF3 synthetic catalogs into format required for synchronization analysis code (from masters thesis), ran analysis
  • worked on 45 degree rotation algorithm to plot only data along the diagonal of recurrence plots

Today:

  • finalize AGU abstract with Tom, submit
  • register for SCEC annual meeting
  • finish recurrence plot rotation work, make plots for UCERF3-TD

Blocked:

no

Followups:

  • broadband cybershake call at 11:30


Lower priority or longer term tasks

  • Fill in missing site/rupture distances in CyberShake DB for ERF 36 (200m)