Staff Priorities - Scott: Difference between revisions

From SCECpedia
Jump to navigationJump to search
Scottcal (talk | contribs)
No edit summary
Scottcal (talk | contribs)
No edit summary
Line 1: Line 1:
== Yesterday ==
== Yesterday ==
*XSEDE 15
*Submitted AGU abstract
*Booked SCEC AM hotel, travel, registration
*Installed BBP on Blue Waters, seg faults on unit tests
*Renewed OSG certificate for Titan


== Today ==
== Today ==
*AGU abstract
*Go through emails
*Gather Study 15.4 metrics from Titan logs
*Gather Study 15.4 metrics from Titan logs
*Gather Study 15.4 metrics from Blue Waters logs
*Gather Study 15.4 metrics from Blue Waters logs
*Gather Study 15.4 metrics from workflow logs
*Gather Study 15.4 metrics from workflow logs
*Start population of Pegasus-statistics DB
*Start population of Pegasus-statistics DB
*Renew proxy certificate for Titan
 


== Blocked ==
== Blocked ==
Line 16: Line 15:


== Follow-ups ==
== Follow-ups ==
*HighF call (11a)
*Call with Phil at 1:30
*BB CyberShake (11:30a)
*Call with Phil?


== Areas of Responsibilities ==
== Areas of Responsibilities ==

Revision as of 18:46, 6 August 2015

Yesterday

  • Submitted AGU abstract
  • Installed BBP on Blue Waters, seg faults on unit tests
  • Renewed OSG certificate for Titan

Today

  • Gather Study 15.4 metrics from Titan logs
  • Gather Study 15.4 metrics from Blue Waters logs
  • Gather Study 15.4 metrics from workflow logs
  • Start population of Pegasus-statistics DB


Blocked

  • No

Follow-ups

  • Call with Phil at 1:30

Areas of Responsibilities

  • CyberShake
  • Broadband CyberShake
  • Code migration