Staff Priorities - Kevin: Difference between revisions
From SCECpedia
Jump to navigationJump to search
No edit summary |
No edit summary |
||
| Line 1: | Line 1: | ||
10/ | 10/16/15 | ||
== Yesterday: == | == Yesterday: == | ||
* | * descriptions of MCEr calculations for Rob | ||
* | * provided MCEr results for CB | ||
** Ned | * helped Glenn Biasi with MeanUCERF3 ERF in OpenSHA apps | ||
* | * worked through EQ depth issue with Ned in ETAS simulations | ||
* launched new set of simulations on Stampede, final set for Powell Center meeting | |||
== Today: == | == Today: == | ||
* post process/generate plots for final powell center meeting ETAS runs. | |||
* post process/generate plots for | * submit a few more requested runs for Ned, post process when done (likely Saturday evening) | ||
* | * write scripts to better track progress of ETAS runs, detect issues | ||
* FYI, at USGS Powell Center meeting in Fort Collins next week | |||
== Blocked: == | == Blocked: == | ||
Revision as of 18:15, 16 October 2015
10/16/15
Yesterday:
- descriptions of MCEr calculations for Rob
- provided MCEr results for CB
- helped Glenn Biasi with MeanUCERF3 ERF in OpenSHA apps
- worked through EQ depth issue with Ned in ETAS simulations
- launched new set of simulations on Stampede, final set for Powell Center meeting
Today:
- post process/generate plots for final powell center meeting ETAS runs.
- submit a few more requested runs for Ned, post process when done (likely Saturday evening)
- write scripts to better track progress of ETAS runs, detect issues
- FYI, at USGS Powell Center meeting in Fort Collins next week
Blocked:
no
Followups:
no
Lower priority or longer term tasks
- Fill in missing site/rupture distances in CyberShake DB for ERF 36 (200m)
- finish mapping of historical earthquakes to UCERF3 ruptures in order to run ETAS simulations of aftershock sequences