Staff Priorities - Scott: Difference between revisions

From SCECpedia
Jump to navigationJump to search
Scottcal (talk | contribs)
No edit summary
Scottcal (talk | contribs)
No edit summary
Line 1: Line 1:
== Yesterday ==
== Yesterday ==
*Monitored Study 15.12; since SCEC disks were down, some issues bringing things back up
*Caught up on emails
*Talked with Kevin about moving ahead on CyberShake/UCERF3 integration


== Today ==
== Today ==
*Add ability to restart stochastic workflows
*Monitor Study 15.12
*Monitor Study 15.12
*Schedule meeting with Val
*Set up Gideon's RVGAHP software, a potential way to submit jobs to Titan
*Run some DB tests


== Blocked ==
== Blocked ==
Line 11: Line 12:


== Follow-ups ==
== Follow-ups ==
*Phil?
*Phil after stand-up


== Areas of Responsibilities ==
== Areas of Responsibilities ==

Revision as of 18:26, 8 January 2016

Yesterday

  • Caught up on emails
  • Talked with Kevin about moving ahead on CyberShake/UCERF3 integration

Today

  • Monitor Study 15.12
  • Set up Gideon's RVGAHP software, a potential way to submit jobs to Titan
  • Run some DB tests

Blocked

  • No

Follow-ups

  • Phil after stand-up

Areas of Responsibilities

  • CyberShake
  • Broadband CyberShake
  • Code migration