Staff Priorities - Scott: Difference between revisions

From SCECpedia
Jump to navigationJump to search
Scottcal (talk | contribs)
No edit summary
Scottcal (talk | contribs)
No edit summary
Line 1: Line 1:
== Yesterday ==
== Yesterday ==
*Gathered and sent data to Morgan
*Run BBP unit tests on RC2 - 1 test failed
*Decided not to worry about moment DB engine, since we're going to migrate anyway
*Regenerated viz with velocity model boxes, revised scaling
*Visualized run with v1.2 partitioning - small differences but nothing major
*Updated the DB so that the new Study table is integrated
*Started cleaning up and migrating old runs to the correct Study and Hazard Dataset


== Today ==
== Today ==
*Run BBP unit tests on RC2
*Finish modifying DB
*Regenerate viz with velocity model boxes, revised scaling
*Add Study start/end times to DB
*Gather metrics from Study 15.12
*Gather metrics from Study 15.12
*Document details of stochastic sims in Study 15.12 on wiki
*Document details of stochastic sims in Study 15.12 on wiki
*Visualize run with v1.2 partitioning
*Update the DB so that the new Study table is integrated
*Draft DB migration procedure
*Draft DB migration procedure
*Document and put into version control tools for creating viz
*Create velocity model for statewide 1 Hz SGT run
*Remove and rebuild code without Vp ceiling


== Blocked ==
== Blocked ==
Line 16: Line 20:


== Follow-ups ==
== Follow-ups ==
*No
*Intern call at 1 pm


== Areas of Responsibilities ==
== Areas of Responsibilities ==

Revision as of 17:03, 12 May 2016

Yesterday

  • Run BBP unit tests on RC2 - 1 test failed
  • Regenerated viz with velocity model boxes, revised scaling
  • Visualized run with v1.2 partitioning - small differences but nothing major
  • Updated the DB so that the new Study table is integrated
  • Started cleaning up and migrating old runs to the correct Study and Hazard Dataset

Today

  • Finish modifying DB
  • Add Study start/end times to DB
  • Gather metrics from Study 15.12
  • Document details of stochastic sims in Study 15.12 on wiki
  • Draft DB migration procedure
  • Document and put into version control tools for creating viz
  • Create velocity model for statewide 1 Hz SGT run
  • Remove and rebuild code without Vp ceiling

Blocked

  • No

Follow-ups

  • Intern call at 1 pm

Areas of Responsibilities

  • CyberShake
  • Broadband CyberShake
  • Code migration