Staff Priorities - Scott: Difference between revisions

From SCECpedia
Jump to navigationJump to search
Scottcal (talk | contribs)
No edit summary
Scottcal (talk | contribs)
No edit summary
Line 1: Line 1:
== Yesterday ==
== Yesterday ==
*Run BBP unit tests on RC2 - 1 test failed
*Finished modifying DB
*Regenerated viz with velocity model boxes, revised scaling
*Added Study start/end times to DB
*Visualized run with v1.2 partitioning - small differences but nothing major
*Submitted job to create velocity model for statewide 1 Hz SGT run
*Updated the DB so that the new Study table is integrated
*Changed Vp ceiling to 9500 m/s
*Started cleaning up and migrating old runs to the correct Study and Hazard Dataset


== Today ==
== Today ==
*Finish modifying DB
*Create slides for UGMS meeting
*Add Study start/end times to DB
*Continue work on statewide 1 Hz SGT run
*Gather metrics from Study 15.12
*Gather metrics from Study 15.12
*Document details of stochastic sims in Study 15.12 on wiki
*Document details of stochastic sims in Study 15.12 on wiki
*Draft DB migration procedure
*Draft DB migration procedure
*Document and put into version control tools for creating viz
*Document and put into version control tools for creating viz
*Create velocity model for statewide 1 Hz SGT run
*Remove and rebuild code without Vp ceiling
*Create slides for UGMS meeting


== Blocked ==
== Blocked ==
Line 21: Line 17:


== Follow-ups ==
== Follow-ups ==
*Intern call at 1 pm
*CyberShake calls at 11


== Areas of Responsibilities ==
== Areas of Responsibilities ==

Revision as of 17:18, 13 May 2016

Yesterday

  • Finished modifying DB
  • Added Study start/end times to DB
  • Submitted job to create velocity model for statewide 1 Hz SGT run
  • Changed Vp ceiling to 9500 m/s

Today

  • Create slides for UGMS meeting
  • Continue work on statewide 1 Hz SGT run
  • Gather metrics from Study 15.12
  • Document details of stochastic sims in Study 15.12 on wiki
  • Draft DB migration procedure
  • Document and put into version control tools for creating viz

Blocked

  • No

Follow-ups

  • CyberShake calls at 11

Areas of Responsibilities

  • CyberShake
  • Broadband CyberShake
  • Code migration