Staff Priorities - Scott: Difference between revisions

From SCECpedia
Jump to navigationJump to search
Scottcal (talk | contribs)
No edit summary
Scottcal (talk | contribs)
Line 12: Line 12:
*Draft DB migration procedure
*Draft DB migration procedure
*Document and put into version control tools for creating viz
*Document and put into version control tools for creating viz
*Figure out what to do about intern XSEDE accounts


== Blocked ==
== Blocked ==

Revision as of 23:07, 13 May 2016

Yesterday

  • Finished modifying DB
  • Added Study start/end times to DB
  • Submitted job to create velocity model for statewide 1 Hz SGT run
  • Changed Vp ceiling to 9500 m/s

Today

  • Create slides for UGMS meeting
  • Continue work on statewide 1 Hz SGT run
  • Gather metrics from Study 15.12
  • Document details of stochastic sims in Study 15.12 on wiki
  • Draft DB migration procedure
  • Document and put into version control tools for creating viz
  • Figure out what to do about intern XSEDE accounts

Blocked

  • No

Follow-ups

  • CyberShake calls at 11

Areas of Responsibilities

  • CyberShake
  • Broadband CyberShake
  • Code migration