Staff Priorities - Scott: Difference between revisions

From SCECpedia
Jump to navigationJump to search
Scottcal (talk | contribs)
No edit summary
Scottcal (talk | contribs)
No edit summary
Line 1: Line 1:
== Yesterday ==
== Yesterday ==
*Created wiki entry detailing CyberShake output data formats, emailed to Nenad
*Continue work on statewide 1 Hz SGT run - parallelized smoothing code
*Sent sample curves to Rob for discussion
*Workflow presentation call
*Call with Phil on tomography
*Queued up PAS with rvsig1=0.1 to compare


== Today ==
== Today ==
*Get sample code together for Nenad
*Gather metrics from Study 15.12
*Gather metrics from Study 15.12
*Document details of stochastic sims in Study 15.12 on wiki
*Document details of stochastic sims in Study 15.12 on wiki
*Figure out what to do about intern XSEDE accounts
*Figure out what to do about intern XSEDE accounts
*Reply to John and Phil re:DB migration
*Continue work on statewide 1 Hz SGT run: plot before and after smoothing to make sure it worked correctly
*Continue work on statewide 1 Hz SGT run
*Generate NGA2 comparison curves (with RotD50) for 5 Study 15.12 sites
*Get outline of workflow presentation together
*Check on PAS run


== Blocked ==
== Blocked ==
Line 16: Line 17:


== Follow-ups ==
== Follow-ups ==
*No
*Tomography call at 11


== Areas of Responsibilities ==
== Areas of Responsibilities ==

Revision as of 17:13, 20 May 2016

Yesterday

  • Continue work on statewide 1 Hz SGT run - parallelized smoothing code
  • Workflow presentation call
  • Call with Phil on tomography
  • Queued up PAS with rvsig1=0.1 to compare

Today

  • Gather metrics from Study 15.12
  • Document details of stochastic sims in Study 15.12 on wiki
  • Figure out what to do about intern XSEDE accounts
  • Continue work on statewide 1 Hz SGT run: plot before and after smoothing to make sure it worked correctly
  • Generate NGA2 comparison curves (with RotD50) for 5 Study 15.12 sites
  • Check on PAS run

Blocked

  • No

Follow-ups

  • Tomography call at 11

Areas of Responsibilities

  • CyberShake
  • Broadband CyberShake
  • Code migration