Staff Priorities - David: Difference between revisions

From SCECpedia
Jump to navigationJump to search
Davidgil (talk | contribs)
No edit summary
Davidgil (talk | contribs)
No edit summary
Line 1: Line 1:
== Yesterday ==
== Yesterday ==


* Fixed SM issue:
* Wrapped up new plotting scripts:
** Fortran string length, plus null termination
** More easily modifiable, Python 3-compatible
** Needed extra libraries (15.10.0 needs ldl)
** Scripts intended to work with legacy UCVM and new
** Updated code on wiki
* Generated SRL slices
** Tested on Mac plus Linux
** Look similar, but not equal
* Pinged SC about CyberShake model
* Uploaded new documentation mechanism for API
* Started on replicating vertical slices from SRL paper


== Today ==
== Today ==


* Finish replicating plots from SRL paper
* Work on annual meeting confirmation view, email, and aggregate
** LARSE sections through S4.26
* Web dev meetings @ 11:00am, 11:30am
** Vertical slices through CCA
* Check UCVM code into GitHub, merge with existing UCVM prototype
* Check remaining models into GitHub
* Citations for UCVM on wiki page
* Continue work on prototype new UCVM version
* Web discussion at 11am


== Blocked ==
== Blocked ==
Line 24: Line 21:
== Followups ==  
== Followups ==  


* Web call
* Web calls

Revision as of 16:47, 28 June 2016

Yesterday

  • Wrapped up new plotting scripts:
    • More easily modifiable, Python 3-compatible
    • Scripts intended to work with legacy UCVM and new
  • Generated SRL slices
    • Look similar, but not equal
  • Uploaded new documentation mechanism for API

Today

  • Work on annual meeting confirmation view, email, and aggregate
  • Web dev meetings @ 11:00am, 11:30am
  • Check UCVM code into GitHub, merge with existing UCVM prototype
  • Citations for UCVM on wiki page

Blocked

  • No

Followups

  • Web calls