Staff Priorities - David: Difference between revisions

From SCECpedia
Jump to navigationJump to search
Davidgil (talk | contribs)
No edit summary
Davidgil (talk | contribs)
No edit summary
Line 1: Line 1:
== Yesterday ==
== Yesterday ==


* Fixed some issues with prototype
* Sick day
** E.g. circular imports within Python
* On day before that:
* Feedback on web site
* Discovered there is a strong overhead to calling C code from Python
** Looked good, sent some comments
** Needed to Cythonize CVM-S4 model library
** Meeting with TH, EP about feedback
** Time to query 450,000 points dropped from 35 seconds to 15 seconds


== Today ==
== Today ==


* Sent SC 1D BBP model
* Sick day mostly
* Continue UCVM prototype
* Finish MPI version of UCVM meshing utility
* Send PM plan for next three weeks
* Fix issues with aftershock


== Blocked ==
== Blocked ==

Revision as of 15:54, 5 August 2016

Yesterday

  • Sick day
  • On day before that:
  • Discovered there is a strong overhead to calling C code from Python
    • Needed to Cythonize CVM-S4 model library
    • Time to query 450,000 points dropped from 35 seconds to 15 seconds

Today

  • Sick day mostly
  • Finish MPI version of UCVM meshing utility
  • Fix issues with aftershock

Blocked

  • No

Followups

  • No