Staff Priorities - Kevin: Difference between revisions

From SCECpedia
Jump to navigationJump to search
Kmilner (talk | contribs)
No edit summary
Kmilner (talk | contribs)
No edit summary
 
Line 1: Line 1:
8/22/16
8/23/16


== Yesterday: ==
== Yesterday: ==
* met with Tom
** needed help with SCEC-VDO figures for intern proposal
* worked on transparent polygon render order in VTK, not yet successful
* CyberShake call
* CyberShake call
* UCERF3 Science paper figure work:
* UCERF3 Science paper figure work:

Latest revision as of 17:10, 23 August 2016

8/23/16

Yesterday:

  • met with Tom
    • needed help with SCEC-VDO figures for intern proposal
  • worked on transparent polygon render order in VTK, not yet successful
  • CyberShake call
  • UCERF3 Science paper figure work:
    • Finished SCEC-VDO figure work, generated first draft of all Mojave M7 SCEC-VDO figures
    • discovered that 10k Mojave M7 simulations isn't enough for stable spatial distribution of probability gain. Submitted more calcs at Stampede which ran over the weekend, now up to 100k

Today:

  • work on web location for UCERF3-ETAS simulations:
  • meet with Tom
  • UCERF3 Science paper figure work:
    • stage back, merge 100k Mojave M7 simulations, redo plots
    • likely plot updates after meeting with Tom
  • work on figures for loss modeling paper

Blocked:

no

Followups:

Tom

Lower priority or longer term tasks

  • once new server is finished, add page on UCERF3-TD supplement corrections and add bullet linking to it from http://www.wgcep.org/UCERF3