Staff Priorities - Scott: Difference between revisions

From SCECpedia
Jump to navigationJump to search
Scottcal (talk | contribs)
No edit summary
Scottcal (talk | contribs)
No edit summary
Line 3: Line 3:


== Today ==
== Today ==
*Continue sqlite loads
*Post Google doc with Education BoF contents
*Monitor s001, OSI, s169 runs
*Check on other 1D runs
*Extract seismograms for Rob
*See if renaming functions fixed 3D problem
*See if hpc-scec is back up
*Debug Titan failure
*Email Scott with mentoring ideas
*Get slides together for outreach BoF


== Blocked ==
== Blocked ==
*No GridFTP server at USC
*No
*scec-04 not mounted from shock


== Follow-ups ==
== Follow-ups ==

Revision as of 15:31, 28 October 2016

Yesterday

Today

  • Post Google doc with Education BoF contents
  • Check on other 1D runs
  • See if renaming functions fixed 3D problem
  • See if hpc-scec is back up
  • Debug Titan failure
  • Email Scott with mentoring ideas
  • Get slides together for outreach BoF

Blocked

  • No

Follow-ups

  • 9a, SIGHPC Education
  • 10a, Tom and Feng
  • noon, CyberShake call
  • Fabio, CSEP handoff

Areas of Responsibilities

  • CyberShake
  • Broadband CyberShake
  • Code migration